Accessibility-for-All

2012 Review of Part B & TGD B – Irish Building Regulations

2012-03-02:  Please bear with me while I update you at the start of this post … rather than at the end, which would be more usual here … and logical.

[ In Ireland … a related problem, which continues to fester and cause a great nuisance in an everyday work environment … concerns the lack of proper, i.e. formal, recognition of electronic communications, and information in an electronic format, by public and private organizations … in spite of the following very clear legal text …

2000 Electronic Commerce Act (No. 27 of 2000)

Section 9 – Electronic Form not to Affect Legal Validity or Enforceability

Information (including information incorporated by reference) shall not be denied legal effect, validity or enforceability solely on the grounds that it is wholly or partly in electronic form, whether as an electronic communication or otherwise. ]

.

Yesterday afternoon (1 March 2012), we received the following e-mail communication from the Department of Environment, Community & Local Government (DECLG)

Folks,

Could you please send me your submissions in either Microsoft Word or Excel as it it easier to copy and paste into the format that is required , it is proving rather difficult to copy from a PDF document.

Thank You

Claire Darragh, Architecture / Building Standards, DECLG.

.

I immediately replied …

Dear Claire,

Further to your informal e-mail message, which we received just a short while ago …

Please note that this is not an acknowledgement that the FireOx International Submission was received by the Department … and we certainly do not wish that you copy and paste anything relating to its contents anywhere else.

IF this is a Proper Public Consultation Process … you must adapt internal DECLG systems to suit the Submissions !   We will be communicating with the Minister’s Office concerning this issue.

Once again, I would ask you to properly acknowledge receipt of our Submission, dated 2012-02-14.

.

In connection with the original FireOx International Submission … I would also like to take this opportunity to advise you that:

  • Due to an error in ISO (International Standards Organization) … the publication of ISO 21542: ‘Building Construction – Accessibility and Usability of the Built Environment’, on 12 December 2011, was not notified to people directly involved in its development and drafting, or to the participating national standards organizations ; 

and

  • In order to avoid the wide confusion which the term ‘Fire-Induced Progressive Collapse’ is continuing to cause at international level … the preferred term is now Fire-Induced Progressive Damage.

.

I have amended our Submission accordingly.

Kind regards.

C. J. Walsh, FireOx International – Ireland, Italy & Turkey.

.

.

2012-02-18:  The following is the text of  FireOx International’s Submission, dated 14 February 2012, to the Department of the Environment, Community & Local Government (DECLG) in Dublin … concerning the current review of the Irish Building Regulations Part B & TGD B … including, for good measure, some initial and very pertinent comments on the Irish Building Control Regulations.

None of these comments will come as any surprise to regular visitors here.

It should also be noted that the same comments are just as relevant in the case of the British (England & Wales) Building Regulations, Part B and Approved Document (AD) B !

.

Ms. Claire Darragh, Architecture & Building Standards Section, DECLG.

Dear Claire,

Thank you for this opportunity to advise the Department on some urgent and necessary improvements to Part B: ‘Fire Safety’ of the 2nd Schedule to the Building Regulations in Ireland … and its supporting Technical Guidance Document (TGD) B.

1.  Some Initial Comments

  • The continuing debacle of the Priory Hall Apartment Complex, in Donaghmede Dublin 13, is just the tip of a very large iceberg in Ireland.  Yet, when we now hear that there will be a ‘risk-based’ approach to Septic Tank Inspections, instead of an approach which involves inspecting all septic tanks … independently, competently and thoroughly … it is clear that the Minister, and senior officials in his Department, have failed to learn any lessons from ‘Priory Hall’.

What was happening on Irish construction sites during the Celtic Tiger boom years … has been happening for twenty years all over the country … more precisely, since the introduction of legal national building regulations in 1991, with NO effective building control … and, before that again, in those parts of the country outside of the major urban areas having legal building bye-laws AND effective building control, i.e. mandatory inspections by competent local authority personnel at the foundation level and drainage level of ALL projects … and, depending on the type of project, occasional or frequent inspections above ground level.

Over the years, local authority officials who carried out building bye-law inspections accumulated a considerable wealth of knowledge and understanding about local construction conditions and practices.  This valuable resource, widely used by the construction industry at the time, has now been diluted and discarded.

PLEASE LEARN THE LESSONS FROM ‘PRIORY HALL’ !!

In connection with ALL Applications for Fire Safety Certificates (Part B) and Disability Access Certificates (Part M) … competent and thorough inspections must, from now on, be carried out by local authority personnel to confirm proper implementation of Part B & M, respectively, of the 2nd Schedule to the Building Regulations.

Furthermore … while on site, local authority personnel must not be discouraged, or restricted, from dealing with any other Parts of the 2nd Schedule to the Building Regulations.  Under the present dysfunctional system, important horizontal linkages between different Parts of the 2nd Schedule are being widely disregarded and ignored, e.g. between Parts B & D, between Parts B & M, and between Parts B & A … or between Parts M & D, etc., etc !

  • European Union (EU) Council Directive 89/106/EEC has been repealed … and, instead, we now have EU Regulation No 305/2011 of the European Parliament and of the Council, of 9 March 2011, laying down Harmonised Conditions for the Marketing of Construction Products.

Unlike the earlier EU Directive … this Regulation, applicable in all EU Member States, is binding in its entirety.

And although Annex I of EU Regulation 305/2011 will enter into force from 1 July 2013 … the Department should now prepare for, and slowly begin the process of, incorporating all of the Annex I Basic Requirements for Construction Works into the 2nd Schedule of the Irish Building Regulations.

SEE BELOW …

.

2.  Firefighter Safety

Fully consistent with Basic Requirement for Construction Works 2(e), in Annex I of EU Regulation No. 305/2011 … Revise Part B Requirement 5 to read as follows …

B5  Firefighter Safety, and Access and Facilities for the Fire Service

A building shall be so designed and constructed that the safety of firefighters is adequately considered and, in the event of an outbreak of fire, that there is adequate provision for access for fire appliances and such other facilities as may be required to assist the fire service in the protection of life and property.

Two examples of issues which should be highlighted in a relevant revision/addition to TGD B’s Guidance Text:

  • The incorporation, in building designs, of alternative safe means of approach towards the scene of a fire by firefighters ;
  • The provision of wider staircases in buildings in order to facilitate the recovery of an injured/impaired firefighter during the course of firefighting operations.

.

3.  Protection of Vulnerable Building Users from Fire

The European Union ratified the United Nations Convention on the Rights of Persons with Disabilities (CRPD) on 23 December 2010.  Ireland has not yet ratified the Convention.

However … fully consistent with Ireland’s legal obligation, under Article 4.3 of the Treaty on European Union (TEU), to co-operate fully with EU Institutions in their implementation of this UN Convention … Revise Part B Requirement 1 to read as follows …

B1  Means of Evacuation in the Event of an Outbreak of Fire

A building shall be so designed and constructed that the protection of vulnerable building users is adequately considered and, in the event of an outbreak of fire, that there are adequate and accessible means of evacuation from the building to a place of safety remote from the building, capable of being safely and effectively used.

[ Use of the word ‘escape’, in the context of emergencies, should be strongly discouraged at all times. ]

Concerning TGD B’s Guidance Text … reference to ISO 21542: ‘Building Construction – Accessibility and Usability of the Built Environment’ will be more than sufficient.

.

Specifically relating to Adequate Protection of Vulnerable Building Users from Fire

NOTE WELL THAT BS 9999 (AND BS 5588:PART EIGHT)  IS (ARE)  ENTIRELY UNFIT FOR PURPOSE !!

Please carefully examine the attached PDF File – My Note for the National Standards Authority of Ireland:  ‘BS 9999:2008 & BS 8300:2009 – Impacts on Accessibility Design in Ireland & Implications for ISO Accessibility & Fire Safety Standards’ , dated June 2009.

.

4.  TGD B’s Appendix A – Performance of Materials and Structures

2 Important Notes should be added to Paragraph A21 – Structural Fire Design

  • In complying with Part B, reference should also be made to Part A of the 2nd Schedule of the Building Regulations, particularly Requirement A3 – Disproportionate Collapse ;

and

  • In order to show that a Fire Protection Material/Product/System for Structural Elements properly complies with Part D … it is also necessary, besides showing that it has been adequately fire tested, to show that the material/product/system is durable over a specified, reasonably long life cycle … and that it can adequately resist mechanical damage during construction of the building and, in the event of an outbreak of fire, during the course of that fire incident.

.

Specifically relating to Steel Structural Performance in Fire

You should be aware that Table A1 and Table A2 are only appropriate for use by designers in the case of single, isolated steel structural elements.

In steel structural frame systems, no consideration is given in the Tables to adequate fire protection of connections … or limiting the thermal expansion (and other types of distortion) in fire of steel structural elements … in order to reduce the adverse effects of one steel element’s behaviour on the rest of the frame and/or adjoining non-loadbearing fire resisting elements of construction.

In the case of steel structural frame systems, therefore, the minimum fire protection to be afforded to ALL steel structural elements, including connections, should be 2 Hours.  Connections should also be designed and constructed to be sufficiently robust during the course of a fire incident.  This one small revision will contribute greatly towards preventing Fire-Induced Progressive Damage in buildings … a related, but different, structural concept to Disproportionate Damage …

Disproportionate Damage

The failure of a building’s structural system  (i) remote from the scene of an isolated overloading action;  and (ii) to an extent which is not in reasonable proportion to that action.

Fire-Induced Progressive Damage

The sequential growth and intensification of structural distortion and displacement, beyond fire engineering design parameters, and the eventual failure of elements of construction in a building – during a fire and the ‘cooling phase’ afterwards – which, if unchecked, will result in disproportionate damage, and may lead to total building collapse.

.

With regard to the above … please carefully examine these 2 Series of Posts on FireOx International’s Technical Blog ( www.cjwalsh.ie ), beginning on the dates indicated …

  • 2011-10-25:  NIST’s (2005) Recommendations on the 9-11 WTC Building Collapses … GROUP 1. Increased Structural Integrity – Recommendations 1, 2 & 3 (out of 30) ;

and

  • 2012-01-18:  Progressive Collapse of WTC 7 – 2008 NIST Recommendations – Part 1 of 2 … GROUP 1. Increased Structural Integrity – Recommendation A … and GROUP 2. Enhanced Fire Endurance of Structures – Recommendations B, C, D & E (out of 13).

.

5.  TGD B’s Appendix F – Reference Standards

Add this Important New Standard …

  • ISO 21542 : 2011     Building Construction – Accessibility and Usability of the Built Environment

.

6.  TGD B’s Appendix G – Reference Publications

Add these Two Important Publications …

  • NIST (National Institute of Standards and Technology).  September 2005.  Federal Building and Fire Safety Investigation of the World Trade Center Disaster: Final Report on the Collapse of the World Trade Center Towers.  NIST NCSTAR 1.  Gaithersburg, MD, USA.

and

  • NIST (National Institute of Standards and Technology).  August 2008.  Federal Building and Fire Safety Investigation of the World Trade Center Disaster: Final Report on the Collapse of World Trade Center Building 7.  NIST NCSTAR 1A.  Gaithersburg, MD, USA.

.

Should you wish to receive further information on any of my comments … please consult FireOx International’s Technical Blog at  www.cjwalsh.ie … or contact me directly.

Please acknowledge receipt of this e-mail communication.

.

Kind regards.

C. J. Walsh, FireOx International – Ireland, Italy & Turkey.

.

.

END

Enhanced by Zemanta

Accessible Toilet Room in a Japanese Public Place – Kanazawa

2011-11-28:  Further to my post, dated 20 October 2010

A valuable and essential facility in the grounds of  Kanazawa Castle, Japan … entered directly from the exterior … is this Accessible Toilet Room / WC / Bathroom / Hygiene Room / Rest Room / Sanitary Room (whichever term you are familiar with) provided for public use.  There is no attendant permanently present, and no camera surveillance of the external entrance area.  However, it is regularly cleaned and properly maintained during the Castle’s opening hours.

Colour photograph showing Kanazawa Castle and its grounds, in Japan. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.
Colour photograph showing Kanazawa Castle and its grounds, in Japan. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.

The following photographs show a far more ‘developed’, ‘civilized’ and ‘person-centred’ approach to the design and fit-out of these public facilities (quite common in Japan) … than here in Europe.

Real Accessibility-for-All in action … with no messing around …

Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.
Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.

.

Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.
Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.

.

Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.
Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.

.

Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.
Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.

.

Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.
Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.

.

Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Detailed view of toilet controls and accessories. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.
Colour photograph showing a Public Toilet Room in the grounds of Kanazawa Castle, Japan ... which is Accessible-for-All. Detailed view of toilet controls and accessories. Photograph by CJ Walsh. 2010-04-27. Click to enlarge.

.

.

END

NIST WTC Recommendations 12-15 > Improved Active Protection

Previous Posts in This Series …

2011-10-25:  NIST’s Recommendations on the 9-11 WTC Building CollapsesGROUP 1. Increased Structural Integrity – Recommendations 1, 2 & 3 (out of 30)

2011-11-18:  NIST WTC Recommendations 4-7 > Structural Fire EnduranceGROUP 2.  Enhanced Fire Endurance of Structures – Recommendations 4, 5, 6 & 7

2011-11-24:  NIST WTC Recommendations 8-11 > New Design of StructuresGROUP 3.  New Methods for Fire Resisting Design of Structures – Recommendations 8, 9, 10 & 11

.

2011-11-25:  SOME PRELIMINARY COMMENTS …

  1.     Reliability has always been an issue with Active Fire Protection Systems … but, it is neither acknowledged, nor fully understood, that … Reliability Is Equally An Issue With Passive Fire Protection Measures !

Furthermore, the following should always be taken into account when considering the Safety Factors to be applied in calculating the level of satisfactory fire safety and protection which is provided in a specific project … one of the design objectives in Ethical Fire Engineering.

For example, if Category C below is indicative of the design and construction quality on a particular building site … just think of the Priory Hall Apartment Development in Dublin (!) … the Safety Factors to be applied in the design should be high … and with regard to actual construction, it should be expected that the Reliability of both Active Fire Protection Systems and Passive Fire Protection Measures will be initially low … with Life Cycle Reliability being entirely non-existent.

Quality of Fire Engineering Design & Related Construction 

Category A

(a)   Design of the works is exercised by an independent, appropriately qualified and experienced architect/engineer/fire engineer, with design competence relating to fire safety and protection in buildings … and, most importantly, that he/she interacts directly with the Project Design Professional in Responsible Charge ;

(b)   Installation/fitting of related construction products/systems is exercised by appropriately qualified and experienced personnel, with construction competence relating to fire safety and protection in buildings ;

(c)   Supervision of the works is exercised by appropriately qualified and experienced personnel from the principal construction organization ;

(d)   Regular inspections, by appropriately qualified and experienced personnel familiar with the design, and independent of the construction organization(s), are carried out to verify that the works are being executed in accordance with the fire engineering design.

Category B

(a)   Design of the works is exercised by an independent, appropriately qualified and experienced architect/engineer/fire engineer ;

(b)   Installation/fitting of fire-related construction products/systems is exercised by appropriately qualified and experienced personnel ;

(c)   Supervision of the works is exercised by appropriately qualified and experienced personnel from the principal construction organization.

Category C

This level of design and construction execution is assumed when the requirements for Category A or Category B are not met.

  2.     With regard to Recommendations 12 & 13 below … in an earlier post in this series, and elsewhere, I have defined Disproportionate Damage … and differentiated that structural concept from the related concept of Fire-Induced Progressive Collapse.

A significant number of countries include a requirement on Resistance to Disproportionate Damage in their national building codes.  Often, it is only necessary to consider this requirement in the case of buildings having 5 Storeys, or more … a completely arbitrary height threshold.  I would consider that adequately tying together the horizontal and vertical structural elements of a building … any building … is a fundamental principle of good structural engineering !!

Putting it simply … for the purpose of showing compliance with this structural requirement … it is necessary to demonstrate that a building will remain structurally stable if a portion of the building’s structure is removed … always remembering that every building comprises both structure and fabric, i.e. non-structure.

In reality this may happen, and quite often does happen, when, for example, a large truck runs into the side of a building, which can happen anywhere … or there is a gas explosion in some part of the building, which happened in Dublin’s Raglan House back in 1987, and many times in other countries … or a plane hits a high-rise building, which happened to Milan’s iconic Pirelli Tower in 2002, and to New York’s Empire State Building way back in 1945 … etc., etc.  Raglan House collapsed … the Pirelli Tower and the Empire State Building did not.

[ The World Trade Center Towers were originally designed to absorb the impact of a large plane and to remain structurally stable afterwards … in ambient conditions.  However, what was not considered in the ambient structural design was ‘fire’, i.e. the fuel tanks were empty and no fire in the building would be initiated as a result of the mechanical damage caused by the plane impact … which, on 11 September 2001, proved to be a ridiculous basis for any structural design !   This is why 9-11 should be regarded, at its core, as being a very serious ‘real’ fire incident.]

What I am leading up to is this … the concept of removing a portion of a building, and it remaining structurally stable afterwards … should now – logically and rationally – also be incorporated into the fire engineering design of Active Fire Protection Systems.  In other words, if a portion of a building is removed, will any particular Active Fire Protection System continue to operate effectively in the rest of the building ?   This has implications for the location and adequate protection of critical system components in a building … and for the necessary redundancy, zoning and back-up alternative routeing which must be designed into the system from the beginning !

.

2005 NIST WTC RECOMMENDATIONS

GROUP 4.  Improved Active Fire Protection

Active fire protection systems (i.e. sprinklers, standpipes/hoses, fire alarms, and smoke management systems) should be enhanced through improvements to the design, performance, reliability, and redundancy of such systems.

NIST WTC Recommendation 12.

NIST recommends that the performance and possibly the redundancy of active fire protection systems (sprinklers, standpipes/hoses, fire alarms, and smoke management systems) in buildings be enhanced to accommodate the greater risks associated with increasing building height and population, increased use of open spaces, high-risk building activities, fire department response limits, transient fuel loads, and higher threat profile.  The performance attributes should deal realistically with the system design basis, reliability of automatic/manual operations, redundancy, and reduction of vulnerabilities due to single point failures.  Affected Standards:  NFPA 13, NFPA 14, NFPA 20, NFPA 72, NFPA 90A, NFPA 92A, NFPA 92B, and NFPA 101.  Model Building Codes:  The performance standards should be adopted in model building codes by mandatory reference to, or incorporation of, the latest edition of the standard.

NIST WTC Recommendation 13.

NIST recommends that fire alarm and communications systems in buildings be developed to provide continuous, reliable, and accurate information on the status of life safety conditions at a level of detail sufficient to manage the evacuation process in building fire emergencies;  all communication and control paths in buildings need to be designed and installed to have the same resistance to failure and increased survivability above that specified in present standards.  This should include means to maintain communications with evacuating occupants that can both reassure them and redirect them if conditions change.  Pre-installed fire warden telephone systems can serve a useful purpose and may be installed in buildings and, if so, they should be made available for use by emergency responders.  All communication and control paths in buildings need to be designed and installed to have the same resistance to failure and increased survivability above that specified in present standards.  Affected Standards:  NFPA 1, NFPA 72, and NFPA 101.  Model Building and Fire Codes:  The performance standards should be adopted in model building and fire codes by mandatory reference to, or incorporation of, the latest edition of the standard.

NIST WTC Recommendation 14.

NIST recommends that control panels at fire/emergency command stations in buildings be adapted to accept and interpret a larger quantity of more reliable information from the active fire protection systems that provide tactical decision aids to fire ground commanders, including water flow rates from pressure and flow measurement devices, and that standards for their performance be developed.  Affected Standards:  NFPA 1, NFPA 72, and NFPA 101.  Model Building and Fire Codes:  The performance standards should be adopted in model building and fire codes by mandatory reference to, or incorporation of, the latest edition of the standard.

NIST WTC Recommendation 15.

NIST recommends that systems be developed and implemented for:  (1) real time off-site secure transmission of valuable information from fire alarm and other monitored building systems for use by emergency responders, at any location, to enhance situational awareness and response decisions, and maintain safe and efficient operation;*  and (2) preservation of that information either off-site, or in a black box that will survive a fire or other building failure, for purposes of subsequent investigations and analysis.  Standards for the performance of such systems should be developed, and their use should be required.  Affected Standards:  NFPA 1, NFPA 72, and NFPA 101.  Model Building and Fire Codes:  The performance standards should be adopted in model building and fire codes by mandatory reference to, or incorporation of, the latest edition of the standard.

[ * F-35  The alarm systems in the WTC towers were only capable of determining and displaying: (a) areas that had at some time reached alarm point conditions; and (b) areas that had not.  The quality and reliability of information available to emergency responders at the Fire Command Station was not sufficient to understand the fire conditions.  The only information transmitted outside the buildings was the fact that the buildings had gone into alarm.  Further, the fire alarm system in WTC Building 7, which was transmitted to a monitoring service, was on ‘test mode’ during the morning of 11 September 2001, because routine maintenance was being performed.  Under test mode conditions: (1) the system is typically disabled for the entire building, not just for the area where work is being performed; and (2) alarm signals typically do not show up on an operator console.]

.

.

END

Corporate Social Responsibility – Updated EU Strategy 2011-14

2011-11-15:  The European Commission, in Brussels, recently published a New European Union Policy Document on Corporate Social Responsibility (CSR)COM(2011) 681 final – Brussels, 2011-10-25.

To access this document … just go down to the EUR-Lex Link on the right hand side of this Page.

The Updated EU CSR Strategy for 2011-2014  signals an important change of direction … more a re-balancing of emphasis … which enterprises, of all sizes, should immediately be aware of … and whether or not these enterprises are located within Europe … or outside, as far away as China, India, Japan, South Africa, the USA or Brazil, etc.

The Updated CSR Strategy  also confirms how the merging of the different and interrelated aspects of Sustainable Human & Social Development, i.e. social, economic, environmental, institutional, political and legal … is progressing nicely, and gathering some momentum.  We have discussed this issue here many times … and promoted it elsewhere in our work, particularly during the last decade.  How time flies !

[ In this last regard, reference should also be made to the United Nations Development Programme (UNDP) 2011 Human Development Report: ‘Sustainability and Equity – A Better Future for All’, which was launched in Copenhagen on 2 November 2011.]

.

A New Definition for Corporate Social Responsibility (CSR)

The European Commission puts forward a new definition of CSR as ‘the responsibility of enterprises for their impacts on society’.

Respect for applicable legislation and for collective agreements between social partners are prerequisites for meeting that responsibility.  To fully meet their corporate social responsibility, enterprises should have in place a process to integrate social – environmental – ethical – human rights and consumer concerns into their business operations and core strategy in close collaboration with their stakeholders, with the aim of:

  • maximising the creation of shared value for their owners/shareholders, and for their other stakeholders and society at large ;
  • identifying, preventing and mitigating their possible adverse impacts.

The complexity of that process will depend on factors such as the size of the enterprise and the nature of its operations.  For most small and medium-sized enterprises, especially micro-enterprises, the CSR Process is likely to remain informal and intuitive.

To maximise the creation of shared value, enterprises are encouraged to adopt a long-term, strategic approach to CSR, and to explore the opportunities for developing innovative products, services and business models that contribute to Social Wellbeing and lead to higher quality and more productive jobs.

To identify, prevent and mitigate their possible adverse impacts, large enterprises, and enterprises at particular risk of having such impacts, are encouraged to carry out risk-based due diligence, including through their supply chains.

Certain types of enterprise, such as co-operatives, mutuals, and family-owned businesses, have ownership and governance structures that can be especially conducive to responsible business conduct.

.

The Updated EU CSR Strategy elaborates an Action Agenda for 2011-2014

     1.  Improving Company Disclosure of Social and Environmental Information:  the new strategy confirms the European Commission’s intention to bring forward a new legislative proposal on this issue.

     2.  Enhancing Market Reward for CSR:  this means leveraging EU Policies in the fields of consumption, investment and public procurement in order to promote market reward for responsible business conduct.

     3.  Enhancing the Visibility of CSR and Disseminating Good Practices:  this includes the creation of a European award, and the establishment of sector-based platforms for enterprises and stakeholders to make commitments and jointly monitor progress.

     4.  Improving and Tracking Levels of Trust in Business:  the European Commission will launch a public debate on the role and potential of enterprises, and organise surveys on citizen trust in business.

     5.  Better Aligning European and International Approaches to CSR:  the European Commission highlights the following …

  • OECD Guidelines for Multinational Enterprises ;
  • 10 Principles of the UN Global Compact ;
  • UN Guiding Principles on Business and Human Rights ;
  • ILO Tri-Partite Declaration of Principles on Multinational Enterprises and Social Policy ;
  • ISO 26000 Guidance Standard on Social Responsibility.

     6.  Further Integrating CSR into Education, Training and Research:  the European Commission will provide further support for education and training in the field of CSR, and explore opportunities for funding more research.

     7.  Improving Self- and Co-Regulation Processes:  the European Commission proposes to develop a short protocol to guide the development of future self- and co-regulation initiatives.

     8.  Emphasising the Importance of National and Sub-National CSR Policies:  the European Commission invites EU Member States to present or update their own plans for the promotion of CSR by mid 2012.

.

.

European Commission COM(2011) 681 final – Brussels, 2011-10-25  (PDF File, 136 kb)

.

.

END

Sustainable Fire Engineering – IABSE Lecture 1 December 2011

2011-11-14 …

On Thursday evening, 1st December 2011, at 19.00 hrs … in the Dublin Institute of Technology … I will present an IABSE-Ireland Sponsored Lecture on the subject: ‘Sustainable Fire Engineering IS THE FUTURE !’.

This Presentation has been in continuous development across a snaking international path … Dubayy (UAE) in 2008 … Lund (Sweden) and Bengaluru (India) in 2009 … Dilli (India), Zurich (Switzerland) and Dublin (Ireland) in 2010 … Paris (France), the IFE’s International Fire Conference in Cardiff (Wales) and the ASFP-Ireland Fire Seminar in 2011 … and on 1 December next, in Dublin, I will be introducing some tough new realities for fire engineering generally … not just in Ireland …

Colour photograph showing the impact of witnessing the 9-11 WTC Incident in New York. Sustainable Fire Engineering must be 'reliability-based' & 'person-centred'. But ... do building designers, including fire engineers, actually understand that the people who use their buildings are 'individuals' ... each having a different range of abilities ? Photograph by Marty Lederhandler/AP. Click to enlarge.
Colour photograph showing the impact of witnessing the 9-11 WTC Incident in New York. Sustainable Fire Engineering must be 'reliability-based' & 'person-centred'. But ... do building designers, including fire engineers, actually understand that the people who use their buildings are 'individuals' ... each having a different range of abilities ? Photograph by Marty Lederhandler/AP. Click to enlarge.

.

IABSE Irish National Group Sponsored Lecture

Dublin Institute of Technology, Bolton Street – Michael O’Donnell Room (259)

Thursday, 1 December 2011 @ 19.00 hrs / 7.00 p.m.

CJ Walsh: Sustainable Fire Engineering IS THE FUTURE !  (Lecture Flyer, PDF File, 259 kb)

.

The aim of Sustainable Fire Engineering is to realize a safe and sustainable built environment.

Responding ethically, in built and/or wrought form, to the still evolving concept of sustainable human and social development … a principal objective of Sustainable Fire Engineering is to design for maximum credible fire and user scenarios … in order to maintain a proper and satisfactory level of fire safety and protection over the full life cycle of, for example, a building … and for a Sustainable Building, that life cycle is 100 years minimum.

Sustainable Fire Engineering must, therefore, be ‘reliability-based’ & ‘person-centred’.

This presentation will examine the authentic language and meaning of sustainability … and will then track how this impacts on the professional practice of fire engineering.  Special mention will be made of Fire-Induced Progressive Collapse.

.

See you all there !   And I will be looking forward to a lot of challenging feedback on the night !!

.

.

END

Complaints to the UN Disability Rights Convention Committee

2011-11-14:  At the time of writing, this was the up-to-date position regarding the United Nations Convention on the Rights of Persons with Disabilities (CRPD)

Convention153 Signatories … 106 Ratifications

Optional Protocol90 Signatories … 63 Ratifications

For reasons which can sometimes be complex … individuals and disability-related organizations are reluctant to make valid complaints … at local, regional or national levels in their countries.

This must stop !   If nobody complains … nothing will change !!

.

The following documents should now be used as a Proper Model for Making a Complaint … at any level.  And should all domestic remedies be exhausted at national level in a State Party … you will have saved yourself a lot of time and energy, should you decide to take matters further … because the complaint will already be in the correct CRPD format …

Committee on the Rights of Persons with Disabilities – 15 June 2011

UN CRPD/C/5/2 – Fact Sheet on the Procedure for Submitting Communications to the Committee on the Rights of Persons with Disabilities under the Optional Protocol to the Convention  (PDF File, 41 kb)

UN CRPD/C/5/3 – Guidelines for Submission of Communications to the Committee on the Rights of Persons with Disabilities under the Optional Protocol to the Convention  (PDF File, 47.5 kb)

.

.

END