” In the early hours of the morning of Saturday, 14th February 1981, a disastrous fire swept through a building called the Stardust in the North Dublin suburb of Artane during the course of a St. Valentine’s Night ‘disco’ dance.  Forty eight people were killed and one hundred and twenty eight seriously injured.  The overwhelming majority of the victims were young people. “

‘Introduction’, Report of the Tribunal of Inquiry on the Fire at the Stardust, Artane, Dublin, on the 14th February 1981.  Report dated 30 June 1982.

As a young architect in private practice … I witnessed, at first hand, the Dublin Fire ‘Establishment’ disappear from public view, without trace, after the Stardust Fire Tragedy.  It was almost impossible, for at least a year afterwards, to have a meeting with any Fire Prevention Officer in the Dublin Fire Authority.  This was a very valuable lesson.

Later, following the publication of the Stardust Tribunal Report … were its Recommendations implemented … with urgency … and conscientiously ?   No way.  For example, it was more than ten years after the Stardust Fire before an inadequate system of legal National Building Regulations was introduced in Ireland.  And to this day, the system of AHJ monitoring of construction quality, throughout the country, is weak and ineffective … lacking both competent personnel and resources !

The proof of the pudding is in the eating … and one of the results, also in Dublin, has been last year’s debacle at the Priory Hall Apartment Complex … where all of the residents had to leave their expensive apartments for fire safety (and many other) reasons.  The tip of a very large iceberg.  See my post, dated 18 October 2011 .

And this is where the problems usually begin …

” There has been a tendency among students of architecture and engineering to regard fire safety as simply a question of knowing what is required in terms of compliance with the regulations.  The recommendation of the Tribunal of Enquiry into the Summerland Disaster that those responsible for the design of buildings should treat fire safety as an integral part of the design concept itself, has not yet been reflected in the approach to the subject at university level.  There is still clearly a need for a new approach to the structuring of such courses which will in time bring to an end the attitude of mind, too prevalent at the moment, that compliance with fire safety requirements is something that can be dealt with outside the context of the overall design of the building. “

‘Chapter 9 – Conclusions & Recommendations’, Report of the Tribunal of Inquiry on the Fire at the Stardust, Artane, Dublin, on the 14th February 1981.  Report dated 30 June 1982.

This Recommendation has still not been implemented … and note the reference to the earlier fire at the Summerland Leisure Centre in 1973, on the Isle of Man, when 50 people were killed and 80 seriously injured.

Today … the same attitude of mind, described so well above, stubbornly persists in all sectors, and in all disciplines, of the International Construction Industry … even within ISO Technical Committee 92: ‘Fire Safety’ !

.

Which brings me, neatly, to the recent question posed by Mr. Glenn Horton on the Society of Fire Protection Engineers (SFPE-USA) Page of LinkedIn ( http://www.linkedin.com/groups?gid=96627 ).   As usual, the shortest questions can prove to be the most difficult to answer …

” Can you expand on, or point to where anyone has discussed, the ‘very flawed design approach’ please ? “

.

ESSENTIAL PRELIMINARIES …

     1.  Foundation Documents

I am assuming that ‘people-who-need-to know’, at international level, are familiar with the Recommendations contained in these 2 Reports …

  • NIST (National Institute of Standards and Technology).  September 2005.  Federal Building and Fire Safety Investigation of the World Trade Center Disaster: Final Report on the Collapse of the World Trade Center Towers.  NIST NCSTAR 1   Gaithersburg, MD, USA ;

and

  • NIST (National Institute of Standards and Technology).  August 2008.  Federal Building and Fire Safety Investigation of the World Trade Center Disaster: Final Report on the Collapse of World Trade Center Building 7.  NIST NCSTAR 1A   Gaithersburg, MD, USA ;

… and the contents of the CIB W14 Research WG IV Reflection Document … which, together with its 2 Appendices, can be downloaded from this webpage … https://www.cjwalsh.ie/progressive-collapse-fire/ … under the section headed: ‘April 2012’.

However … I am utterly dismayed by the number of ‘people-who-need-to know’ … who do not know … and have never even bothered to dip into the 2 NIST Reports … or the many long-term Post 9-11 Health Studies on Survivors which have already revealed much priceless ‘real’ information about the short and medium term adverse impacts on human health caused by fire !

CIB W14 Research Working Group IV would again strongly caution that Fire-Induced Progressive Damage and Disproportionate Damage are fundamental concepts to be applied in the structural design of all building types.

.

     2.  Technical Terminology

While attending the ISO TC92 Meetings in Thessaloniki, during the last week of April 2012, I noticed not just one reference to ‘fire doors’ in a Draft ISO Fire Standard … but many.  It surprised me, since I thought this issue had been successfully resolved, at ISO level, many years ago.  There is no such thing as a ‘fire door’ … and the careless referencing of such an object, which has no meaning, in building codes and standards has caused countless problems on real construction sites during the last 20-30 years.

Please follow this line of thought …

Fire Resistance:  The inherent capability of a building assembly, or an element of construction, to resist the passage of heat, smoke and flame for a specified time during a fire.

Doorset:  A building component consisting of a fixed part (the door frame), one or more movable parts (the door leaves), and their hardware, the function of which is to allow, or to prevent, access and egress.

[Commentary: A doorset may also include a door saddle / sill / threshold.]

Fire Resisting Doorset / Shutter Assembly:  A doorset / shutter assembly, properly installed or mounted on site, the function of which is to resist the passage of heat, smoke and flame for a specified time during a fire.

… and so we arrive at the correct term … Fire Resisting Doorset … which, as an added bonus, also alerts building designers, construction organizations, and even AHJ inspectors, to the fact that there is more involved here than merely a door leaf.

Now then, I wonder … how, in any sane and rational world, can the term Fire Resistance be used in relation to structural performance during a fire, and the cooling-phase afterwards ?   Yet, this is exactly what I read in the building codes of many different jurisdictions.  Do people understand what is actually going on ?   Or, is the language of Conventional Fire Engineering so illogical and opaque that it is nearly impossible to understand ?

And … if this problem exists within the International Fire Science & Engineering Community … how is it possible to communicate effectively with other design disciplines at any stage during real construction projects.  The artificial environments found in academia are not my immediate concern.

.

     3.  Fire Research & Development outside CIB W14 & ISO TC92

In 2012 … there is something very wrong when you have to struggle to persuade a group of people who are developing an ISO Standard on Design Fire Scenarios … that they must consider Environmental Impact as one of the major consequences of a fire to be minimized … along with ‘property losses’ and ‘occupant impact’.  This is no longer an option.

Environmental Impact:  Any effect caused by a given activity on the environment, including human health, safety and welfare, flora, fauna, soil, air, water, and especially representative samples of natural ecosystems, climate, landscape and historical monuments or other physical structures, or the interactions among these factors; it also includes effects on accessibility, cultural heritage or socio-economic conditions resulting from alterations to those factors.

So … how timely, and relevant to practitioners, are ISO Fire Standards ?   Perhaps … obsolete at publication … and not very ??

And … there is lot more to the Built Environment than buildings …

Built Environment:  Anywhere there is, or has been, a man-made or wrought (worked) intervention in the natural environment, e.g. cities, towns, villages, rural settlements, service utilities, transport systems, roads, bridges, tunnels, and cultivated lands, lakes, rivers, coasts, and seas, etc … including the virtual environment.

.

We should be very conscious that valuable fire-related research takes place outside, and unrelated to, the established fire engineering groupings of CIB W14 & ISO TC92.  But I am curious as to why this research is not properly acknowledged by, or encouraged and fostered within, the ‘system’ ?

Example A:  Responding to Recommendation 18 in the 2005 NIST WTC Report … a Multi-Disciplinary Design Team published an article in the magazine Bâtiment et Sécurité (October 2005) on The PolyCentric Tower.  I very much enjoy giving practitioners a small flavour of this work, whenever I make presentations at conferences and workshops …

Colour image, from one of my Overhead Presentations ... showing The PolyCentric Tower (2005), developed by a French Multi-Disciplinary Design Team in response to Recommendation 18 in the 2005 NIST WTC Report. Click to enlarge.
Colour image, from one of my Overhead Presentations ... showing The PolyCentric Tower (2005), developed by a French Multi-Disciplinary Design Team in response to Recommendation 18 in the 2005 NIST WTC Report. Click to enlarge.

.

Example B:  In spite of a less than helpful submission (to put it mildly) from ISO TC92 Sub-Committee 4 … ISO 21542: ‘Building Construction – Accessibility & Usability of the Built Environment’ was finally published in December 2011 … but it was developed by a Sub-Committee of ISO TC59: ‘Buildings & Civil Engineering Works’

Colour image, from one of my Overhead Presentations ... showing the design of a notional Fire Evacuation Staircase, with an adjoining Area of Rescue Assistance, which responds directly to the 2005 NIST WTC Recommendations. See Figure 62 in ISO 21542:2011. Click to enlarge.
Colour image, from one of my Overhead Presentations ... showing the design of a notional Fire Evacuation Staircase, with an adjoining Area of Rescue Assistance, which responds directly to the 2005 NIST WTC Recommendations. See Figure 62 in ISO 21542:2011. Click to enlarge.

.

With the involvement and support of ISO Technical Committee 178: ‘Lifts, Elevators & Moving Walks’ during its long gestation … ISO 21542 is now able to indicate that all lifts/elevators in a building should be capable of being used for evacuation in the event of a fire.  This is already a design feature in a small number of completed Tall Building Projects.  Once more, this is no longer an option.

In addition … if a Fire Evacuation Staircase has a minimum unobstructed width of 1.5 m (from edge of handrail on one side of the staircase to edge of handrail on the opposite side) … this will be sufficient to facilitate the following tasks …

  • Assisted Evacuation by others, or Rescue by Firefighters, for those building users who cannot independently evacuate the building, e.g. people with activity limitations … shown above, on the right, is assistance being given by three people (one at each side, with one behind) to a person occupying a manual wheelchair ;
  • Contraflow Circulation … emergency access by firefighters entering a building and moving towards a fire, while people are still evacuating from the building to a ‘place of safety’ remote from the building … shown above, bottom left, is how not to design an evacuation staircase (!) ;
  • Stretcher Lifting … lifting a mobility-impaired person, who may be conscious or unconscious, on a stretcher ;
  • Firefighter Removal & Contraflow … shown above, top left, is removal of a firefighter from a building by colleagues in the event of injury, impairment, or a fire event induced health condition … while other firefighters may still be moving towards the fire.

Note that in a Fire Evacuation Staircase … all Handrails are continuous … each Stair Riser is a consistent 150 mm high … each Stair Tread/Going is a consistent 300 mm deep … and there are No Projecting Stair Nosings.

Most importantly … in order to assign sufficient building user space in the design of an Area of Rescue Assistance … ISO 21542 also provides the following Key Performance Indicator … just one aspect of a ‘maximum credible user scenario’ …

10% of people using a building (including visitors) have an impairment, which may be visual or hearing, mental, cognitive or psychological, or may be related to physical function, with some impairments not being identifiable.

Is There Any Connection Between Examples A & B ?   There is, and it is a connection which is critical for public safety.  The following Performance Indicator illustrates the point …

Innovative Structural Design – Perimeter Core Location – Design for Fire Evacuation – Evacuation for All

” A Building must not only remain Structurally Stable during a fire event, it must remain Serviceable for a period of time which facilitates:

  • Rescue by Firefighters of people with activity limitations waiting in areas of rescue assistance ;
  • Movement of the firefighters and those people with activity limitations, via safe and accessible routes, to Places of Safety remote from the building ;
  • With an assurance of Health, Safety & Welfare during the course of this process of Assisted Evacuation. “

[Refer also to the Basic Requirements for Construction Works in Annex I of the European Union’s Construction Product Regulation 305/2011 – included as Appendix II of the CIB W14 WG IV Reflection Document.  Are the Basic Requirements being interpreted properly … or even adequately ??]

.

ANSWERS TO THE QUESTION …

The Greek Paper is included as Appendix I of CIB W14 WG IV Reflection Document … in order to show that Fire-Induced Progressive Damage is also an issue in buildings with a reinforced concrete frame structure.  It is more straightforward, here, to concentrate on buildings with a steel frame structure.

a)  Use of ‘Fire Resistance'(?) Tables for Structural Elements

We should all be familiar with these sorts of Tables.  The information they contain is generated from this type of standard test configuration in a fire test laboratory …

… and this sort of criterion for ‘loadbearing horizontal elements’ in a fire test standard …

A single isolated loaded steel beam, simply supported, is being tested.  As deflection is the only type of deformation being observed and measured … the critical temperature of the steel, i.e. the point when material strength begins to fail rapidly and the rate of beam deflection increases dramatically … is the sole focus for all stakeholders.

Using these Tables, it is very difficult to escape the conclusion that we are merely interior decorators … applying flimsy thermal insulation products to some steel structural elements (not all !) … according to an old, too narrowly focused, almost static (‘cold form’) recipe, which has little to do with how today’s real buildings react to real fires !

This ‘non-design’ approach is entirely inadequate.

.

With regard to the use of these Tables in Ireland’s Building Regulations (Technical Guidance Document B), I recently submitted the comments below to the relevant Irish AHJ.  These same comments could just as easily apply to the use of similar Tables in the Building Regulations for England & Wales (Approved Document B) …

” You should be aware that Table A1 and Table A2 are only appropriate for use by designers in the case of single, isolated steel structural elements.

In steel structural frame systems, no consideration is given in the Tables to adequate fire protection of connections … or limiting the thermal expansion (and other types of deformation) in fire of steel structural elements … in order to reduce the adverse effects of one element’s behaviour on the rest of the frame and/or adjoining non-loadbearing fire resisting elements of construction.

In the case of steel structural frame systems, therefore, the minimum fire protection to be afforded to ALL steel structural elements, including connections, should be 2 Hours.  Connections should also be designed and constructed to be sufficiently robust during the course of a fire incident.  This one small revision will contribute greatly towards preventing Fire-Induced Progressive Damage in buildings … a related, but different, structural concept to Disproportionate Damage

Disproportionate Damage

The failure of a building’s structural system  (i) remote from the scene of an isolated overloading action;  and (ii) to an extent which is not in reasonable proportion to that action.

Fire-Induced Progressive Damage

The sequential growth and intensification of structural deformation and displacement, beyond fire engineering design parameters, and the eventual failure of elements of construction in a building – during a fire and the ‘cooling phase’ afterwards – which, if unchecked, will result in disproportionate damage, and may lead to total building collapse.

Coming from this background and heritage … it is very difficult to communicate with mainstream, ambient structural engineers who are speaking the language of structural reliability, limit state design and serviceability limit states.

.

b)  NIST Report: ‘Best Practice Guidelines for Structural Fire Resistance Design of Concrete and Steel Buildings’ (NISTIR 7563 – February 2009)

At the end of Page 18 in NISTIR 7563 …

2.7.2 Multi-Storey Frame Buildings

In recent years, the fire performance of large-frame structures has been shown in some instances to be better than the fire resistance of the individual structural elements (Moore and Lennon 1997).  These observations have been supported by extensive computer analyses, including Franssen, Schleich, and Cajot (1995) who showed that, when axial restraint from thermal expansion of the members is included in the analysis of a frame building, the behaviour is different from that of the column and beam analyzed separately.

A large series of full-scale fire tests was carried out between 1994 and 1996 in the Cardington Laboratory of the Building Research Establishment in England.  A full-size eight-storey steel building was constructed with composite reinforced concrete slabs on exposed metal decking, supported on steel beams with no applied fire protection other than a suspended ceiling in some tests.  The steel columns were fire-protected.  A number of fire tests were carried out on parts of one floor of the building, resulting in steel beam temperatures up to 1000 °C, leading to deflections up to 600 mm but no collapse and generally no integrity failures (Martin and Moore 1997). “

Those were Experimental Fire Tests at Cardington, not Real Fires … on ‘Engineered’ Test Constructions, not Real Buildings !!   And … incredibly, for a 2009 document … there is no mention at all of World Trade Center Buildings 1, 2 or 7 !?!   Where did they disappear to, I wonder ?   Too hot to handle ???

Computer Model Verification and Validation (V&V) are very problematic issues within the International Fire Science and Engineering Community.  The expected outcome of a Model V&V Process, however, is a quantified level of agreement between experimental data (and, if available, real data) and model prediction … as well as the predictive accuracy of the model.

Now … please meditate carefully on the following …

” NCSTAR 1A (2008)  Recommendation D   [See also NCSTAR 1 (2005)  Recommendation 5)

NIST recommends that the technical basis for the century-old standard for fire resistance testing of components, assemblies and systems be improved through a national effort.  Necessary guidance also should be developed for extrapolating the results of tested assemblies to prototypical building systems.  A key step in fulfilling this Recommendation is to establish a capability for studying and testing components, assemblies, and systems under realistic fire and load conditions.

Of particular concern is that the Standard Fire Resistance Test does not adequately capture important thermally-induced interactions between structural sub-systems, elements, and connections that are critical to structural integrity.  System-level interactions, especially due to thermal expansion, are not considered in the standard test method since columns, girders, and floor sub-assemblies are tested separately.  Also, the performance of connections under both gravity and thermal effects is not considered.  The United States currently does not have the capability for studying and testing these important fire-induced phenomena critical to structural safety.

Relevance to WTC 7:  The floor systems failed in WTC 7 at shorter fire exposure times than the specified fire rating (two hours) and at lower temperatures because thermal effects within the structural system, especially thermal expansion, were not considered in setting the endpoint criteria when using the ASTM E 110 or equivalent testing standard.  The structural breakdowns that led to the initiating event, and the eventual collapse of WTC 7, occurred at temperatures that were hundreds of degrees below the criteria that determine structural fire resistance ratings. “

The design approach outlined in NISTIR 7563 is not only very flawed … it lacks any validity … because very relevant and important real fire data has been totally ignored.  The Cardington Experimental Fires were not all that they seemed.

.

c)  Current ISO TC92 International Case Study Comparison

Structural Fire Engineering Design of an Airport Terminal Building serving the Capital City of a large country (which shall remain nameless) … constructed using Portal Steel Frames …

My first concern is that the Structural Fire Engineering Design has been undertaken in isolation from other aspects of the Building’s Fire Engineering Design.

On Page 3 of the Case Study Report …

4.2 Objectives & Functional Requirements for Fire Safety of Structures

The fire safety objectives of the airport terminal emphasize the safety of life, conservation of property, continuity of operations and protection of the environment. “

Should these not be the Project-Specific Fire Engineering Design Objectives ?   Since when, for example, is ‘continuity of operations’ a concern in building codes ??

On Page 7 of the Case Study Report …

5.3  Identify Objectives, Functional Requirements & Performance Criteria for Fire Safety of Structure

The Fire Safety Objective of the Steel Structure:  There should be no serious damage to the structure or successive collapse in case of fire.

The Functional Requirements are defined as the followings:

(1)  Prevent or limit the structural failure in case of fire so as to prevent the fire from spreading within the compartment or to the adjacent fire compartment or the adjacent buildings (to prevent fire spread) ;

(2)  Prevent or limit the partial structural failure in case of fire so as to protect the life safety of the occupants and firefighters (to protect life safety) ;

(3)  Prevent or limit the structural deformation or collapse so as not to increase the cost or difficulties of the after-fire restoration (to reduce reconstruction cost).

One of the following Performance Requirements shall be met:

(1)  The load-bearing capacity of the structure (Rd) shall not be less than the combined effect (Sm) within the required time, that is Rd ≥ Sm.  (The maximum permitted deflection for the steel beam shall not be larger than L/400, and the maximum stress of the structure under fire conditions shall not be larger than fyT) ;   or

(2)  The fire resistance rating of the steel structure (td) shall not be less than the required fire resistance rating (tm), that is, td ≥ tm ;   or

(3)  Td – the critical internal temperature of the steel structure at its ultimate state shall not be less than Tm (the maximum temperature of the structure within required fire resistance time duration), that is Td ≥ Tm.  (300 ℃) “

Once again … we see an emphasis on critical temperature, beam deflection (only), and material strength.  L/400 is an impressive Fire Serviceability Limit State … a different world from L/20 or L/30 … but what about other important types of steel structural member deformation, e.g. thermal expansion and distortion ??

Furthermore … if there is a major fire in the area under the lower roof (see Section above) … because of structural continuity, any serious impact on the small frame will also have an impact on the large frame.  For Structural Fire Engineering reasons … would it not be wiser to break the structural continuity … and have the small and large portal frames act independently ?

It is proposed that the Portal Frames will NOT be fully fire protected … just the columns, up to a height of 8 metres only.  If ‘conservation of property’ and ‘continuity of operations’ are important fire engineering design objectives in this project … why isn’t all of the steel being fully protected ???   What would be the additional cost, as a percentage of the total project cost ?

What exactly is infallible about current Design Fires and Design Fire Scenarios ???   Not much.  And in the case of this particular building, should a ‘maximum credible fire scenario’ be at least considered ?

And … what is the fire protection material, product or system being used to protect the Portal Frames ?   Will it be applied, fixed or installed correctly ?   What is its durability ?   Will it be able to resist mechanical damage during the construction process … and afterwards, during the fire event ?   What is the reliability of this form of fire protection measure ??

So many questions …

.

.

END

Enhanced by Zemanta

CIB W14’s Newly Updated Aims & Objectives – A Dynamic Text

2012-05-03:  Yesterday, I mentioned that the Aims & Objectives of CIB Working Commission 14: ‘Fire Safety’ had been substantially updated.  More than that … this text is to be regarded as being dynamic … kept under continual review … in order that it will remain fresh, vibrant, and relevant to the needs of the time.

Our discussions in Thessaloniki (Salonika), last week, were a continuation of a process which began in Zurich, during 2010.

Just to remind everyone … this is CIB W14: ‘Fire Safety’

Working Commission 14 is an international, multi-stakeholder, trans-disciplinary, pre-normalization forum for discussion and action, on research and innovation in Fire Science and Engineering for the design, construction and operation of a Safe and Sustainable Built Environment.

.

CIB W14: These are its newly updated Aims & Objectives (2012)

  1. To create an ongoing research and innovation focus for the development of a comprehensive, coherent, rational and empirical basis for a Safe and Sustainable Built Environment, which includes fire science and engineering practices, procedures and design methodologies.
  2. To promote the acceptance of Fire Science and Engineering Practices, Procedures and Design Methodologies worldwide, and to encourage their use in international/regional/national/local building and fire safety legislation, codes, regulations and standards.
  3. To provide Technical Input, from a fire science and engineering perspective, to other relevant CIB Working Commissions and Task Groups.
  4. To facilitate the Transfer of State-of-the-Art Fire Science and Engineering Technology at international level.
  5. To encourage Capacity Building for fire science and engineering worldwide.
  6. To liaise and co-operate/collaborate with Other Organizations having similar or related aims and objectives.

.

To Meet CIB W14’s Aims & Objectives …

a)     Research and innovation projects with a specific task, well-defined scope and a limited timeframe may be initiated and directly/indirectly undertaken by the Membership of CIB W14 ;

b)     Output from these projects and the other work of W14 may be placed in the public domain, in hardcopy and/or electronic formats, as CIB publications, as papers/articles in international journals, conference/seminar/workshop proceedings, and discussion/reflection documents ;

c)     Conferences/seminars/workshops and other events which further W14′s Aims & Objectives may be organized by the Membership of W14 ;

d)     CIB may endorse conferences/seminars/workshops and other events planned by organizations having similar or related aims and objectives to W14 ;   and

e)     W14 may circulate its publications, and information on its research and innovation projects, to the membership of other CIB working commissions and task groups.

.

Interested in Joining CIB W14: ‘Fire Safety’ ?

The CIB WebSite is located at … http://www.cibworld.nl

The CIB General Secretariat is located in The Netherlands.  Go to the ‘Contact Us’ WebPage for information … http://www.cibworld.nl/site/contact_us.html

Then …

  • Send an e-mail to Dr. Wim Bakens, Secretary General of CIB – a man who likes good Irish whiskey (!) – and him ask for a Membership Application Form.  His e-mail address: wim.bakens@cibworld.nl   Tell him that I sent you, and that you want to join CIB Working Commission 14 ;

or …

.

The More Diverse Our Membership … The More Creative Our Output !

.

.

END

Enhanced by Zemanta

Accessibility-for-All … New Context … Same Old Problems !

2012-04-21:  The context for considering and properly implementing Accessibility-for-All has changed … changed utterly … but some old problems persist, and stubbornly remain …

NEW INTERNATIONAL CONTEXT

     A.  At the time of writing, the United Nations Convention on the Rights of Persons with Disabilities (UN CRPD) has been ratified by 111 Countries and the European Union.

Concerning Accessibility of the Built Environment … UN CRPD Preamble Paragraph (g), and Articles 9 – 11 – 12 are the most immediately relevant.  These texts can be easily found elsewhere on this BLOG … please use the ‘search’ facility at the top, right-hand corner of the WebPage.

With the innovative, and internationally accepted, understanding of ‘Accessibility’ – as distinct from ‘Access’ – contained in ISO 21542 : 2011 … the concept meaning: approach and entry to a building, circulation within and use of all the building’s facilities, egress from and removal from the building’s vicinity during normal circumstances, or evacuation in the event of an emergency and movement – via a safe and accessible route – to a place of safety which is remote from the building … it is now possible to deal with Fire Evacuation of Buildings through Article 9 (Accessibility) of the UN CRPD, where it is more in scale … more at home, so to speak … rather than through Article 11 (Situations of Risk & Humanitarian Emergencies), which had to be the case before.

     B.  ISO 21542: ‘Building Construction – Accessibility & Usability of the Built Environment’ … is the important new International Standard mentioned above.  It was published in December 2011.

Ireland has no National Standard (or Code of Practice) on Accessibility.  So, in the absence of an appropriate Harmonized European Standard, ISO 21542 must take precedence over the National Standards of any other European Union Member State.

Here, however, there is a very large fly in the ointment … the guidance text in the 2010 Technical Guidance Document M has been ‘lifted’, almost en masse, from a British National Standard on ‘Access’ … not ‘Accessibility’.  And this flawed process has imported some serious errors into Irish Accessibility Design and Construction Practice … despite my warnings to the relevant authorities.  Please refer back to this post , dated 2009-06-14.

Scope of ISO 21542 : 2011

ISO 21542:2011 specifies a range of requirements and recommendations for many of the elements of construction, assemblies, components and fittings which comprise the built environment.  These requirements relate to the constructional aspects of access to buildings, to circulation within buildings, to egress from buildings in the normal course of events and evacuation in the event of an emergency.  It also deals with aspects of accessibility management in buildings.

ISO 21542:2011  contains provisions with respect to features in the external environment directly concerned with access to a building or group of buildings from the edge of the relevant site boundary or between such groups of buildings within a common site.  It does not deal with those elements of the external environment, such as public open spaces, whose function is self-contained and unrelated to the use of one specific building, nor does it deal with single family dwellings, other than those circulation spaces and fittings that are common to two or more such dwellings.

     C.  Of direct commercial interest within the European Union (and in any countries outside the EU who wish to trade with the EU and the European Economic Area) … Accessibility-Related Construction Products are now included in the framework of the (relatively) new European Union Regulation No.305/2011 of the European Parliament and of the Council, of 9 March 2011, laying down Harmonized Conditions for the Marketing of Construction Products and Repealing Council Directive 89/106/EEC.  [The old EU Directive 89/106/EEC has been repealed … it is finished, it is gone, it is no more !   There will, however, be a suitable transition period from old to new.]

Construction Product (EU Reg.305/2011)  means any product or kit which is produced and placed on the market for incorporation in a permanent manner in construction works or parts thereof and the performance of which has an effect on the performance of the construction works with respect to the basic requirements for construction works.

Construction Works (EU Reg.305/2011)  means buildings and civil engineering works.

Basic Requirement for Construction Works No. 4  in Annex I of the new EU Regulation 305/2011, states the following …

Safety and Accessibility in Use

The construction works must be designed and built in such a way that they do not present unacceptable risks of accidents or damage in service or in operation such as slipping, falling, collision, burns, electrocution, injury from explosion and burglaries.  In particular, construction works must be designed and built taking into consideration accessibility and use for disabled persons.

This is a suitable location for ‘Accessibility’ in Annex I … intimately connected to ‘Safety in Use’.  However, there is one potential drawback.  Specifying the level of safety in an EU Member State is the sole responsibility of the Authorities Having Jurisdiction (AHJ’s) in that Member State.

An Accessible Building is a Safer Building … but a Safe Building is not necessarily ‘Accessible’.  ‘Accessibility’ is a completely different concept to ‘Safety’.  EU Member States have no basis in EU Law … no justification whatever … for arbitrarily deciding on which level of ‘Accessibility’ is appropriate within their territories !

.

SAME OLD PROBLEMS

With all of this New International Context on Accessibility finally in place … I continue to encounter the same old problems …

     1.  Bad Product Design

An enormous quantity of cheap, atrociously designed … you could almost use the word ‘ugly’ … Accessibility-Related Construction Products are imported every year into Ireland, from Britain.  This is one good reason, although not a very satisfactory reason, why architects hate ‘accessibility’ in buildings.  Building users notice fittings and fixtures … and if the fittings and fixtures are ugly … the building is ugly !   But occupational therapists, for example, are also specifying these types of products every day of the week here.

This has got to stop.  Proper attention must be paid to Good Design of Accessibility-Related Construction Products.  An Accessible Building does not have to look like a Hospital Ward !   And Good Design does not have to mean ‘expensive’ !!

I have seen many well designed Accessibility-Related Construction Products, available in the EU marketplace, which have been manufactured in countries such as France, Germany, Italy, and China.

Why can we not access these products in Ireland ??

     2.  No Product Approval

The National Building Regulations/Codes of EU Member States … and all EU Safety at Work legislation … demand that building products and systems must be properly shown to be ‘fit for their intended use in the location of use’.  End of story … very simple !   Regrettably, few people take any notice of this legal requirement.

Late last year, however, I encountered a Chinese Company which manufactured some nicely designed Accessibility-Related Construction Products.  I suggested to one of their sales personnel that, in order to place their products on the market anywhere in the European Union (or the European Economic Area) … there was an urgent need to update their existing ‘CE Mark’ Product Approval Documentation.  When I checked more closely, this Documentation was dubious.  I then suggested that they should place a correct, up-to-date and relevant CE Mark on their construction products … as a matter of priority.  And I received the following reply …

” i’d like to suggest that maybe you can pay for the cost to do this CE, and after you place orders in our factory, we promise return that back to you, and if you like, maybe you can act as our agency in Ireland, will you ? “

[ The sum of money being discussed here was €1,000.]

This proposal was off-the-wall, as we say here in Ireland.  But, I found it impossible to get annoyed … because this strange and weird understanding of the CE Mark, particularly in relation to Accessibility-Related Construction Products, is rife among European Manufacturers also … and European Notified Bodies.  How crazy is that ?

Perhaps my most unusual experience, back in the mid-1990’s, was having to explain to a Manager in a TÜV Laboratory, in Germany, that a Full Test Report must be issued to a Test Sponsor … after the test(s) has/have been completed.  This task required two to three hours of heated discussion !

And … in the absence of any reference to ‘Accessibility’ in the now repealed EU Directive 89/106/EEC … I have encountered some European Manufacturers of Accessibility-Related Construction Products … who, being fully aware of the value of a CE Mark, have used the backdoor method of the EU Medical Devices Directive in order to obtain a CE Mark.  And these were definitely not medical devices !

There is no effective control over the CE Marking of Construction Products within the European Union.  This is no reason to ignore the system … or to abuse the system.

However … if many more people paid attention to the legal requirement, and necessity, of Proper Product Approval and the CE Marking of Accessibility-Related Construction Products … and the professional duty and responsibility to check that compliance/conformity is properly shown … we would have a more Accessible and much Safer Built Environment !!!

.

.

END

Enhanced by Zemanta

Unheeded Fire Hazards in New Energy Efficient Buildings !!

2012-03-29:  The relentless pressure, within the European Union (EU), to bring a greater measure of stability to imported energy supplies … to reduce our overall use of energy … to be far more efficient in the ways we consume those lesser amounts of energy … to find cleaner sources of energy to replace oil, gas, and especially coal … to comply with ambitious targets on climate change mitigation … are all pointing in one direction with regard to design and construction.  We are forced to super-insulate new buildings !

Without many people realizing it, however, we change how fire behaves in a highly insulated building … especially when insulation materials are part of the interior finishes, not carefully buried within the construction.  [Even the old Building Bye-Laws in Dublin City permitted a cavity in a masonry wall up to 150mm wide !]   And, as usual, Building and Fire Regulations are slow to catch up with these important architectural developments.

Let me show you an example of a basement car park in a new hospital (which shall remain nameless !) … where a serious ‘fire’ problem has been festering since it was opened, and occupied, a few years ago.

This hospital could be anywhere in Europe …

Colour photograph showing the basement car park in a hospital. Click this photograph, and the photographs below, to enlarge.
Colour photograph showing the basement car park in a hospital. Click this photograph, and the photographs below, to enlarge.

The ceiling height in this car park is low … approximately 2 metres above floor level.  The ceiling comprises a 6mm off-white calcium silicate board of limited combustibility (for the techies out there – this board is not ‘incombustible’, and it is not ‘non-combustible’) … above which is a 40mm rigid phenolic thermal insulation board … all fixed to the underside of a concrete floor slab.

This phenolic insulation board is very efficient … and during the normal course of events, its job is to stop the loss of heat from the hospital wards and other areas above.  A cold concrete floor is also very uncomfortable for people, i.e. hospital staff, having to walk around on it for long periods.

Because the insulation board is efficient, and it is fixed to the underside of the floor slab … in a fire situation, let’s say that a fire starts in a car … the heat from that fire will be reflected by the insulation board back downwards.  The result:  the fire will be encouraged to spread much more quickly to neighbouring vehicles.  And so, in a very short time, we will have a much larger fire … and a much more intense fire … which will be far more difficult to control and extinguish, when the fire services eventually arrive on the scene.

.

There are a Number of Twists in This Story …

     1.  For all sorts of normal reasons, there are service penetration openings in the car park ceiling shown above (some small and some large), especially in a hospital which is highly serviced … the overall approach to fire and smoke sealing in this new building is not the best … and workmanship is poor …

… which, together, all mean that it will be easy for fire and smoke to spread upwards into the hospital wards and other areas … in the event of a fire emergency.

In a hospital, not everybody is alert and mobile.  It will be difficult to evacuate some people … and it will be nearly impossible, because of their health condition, to evacuate others.  In order for a fire engineering strategy of horizontal evacuation to a ‘safer’ part of the same building to be successfully put into effect during an emergency … it is imperativethat the level of passive protection from fire and smoke provided is high … much higher, here, than in the case of an average office building, for example.  AND … it is criticalthat this high level of protection from fire and smoke is reliable.

In this new hospital building … the photographic evidence clearly shows that both of these criteria have not been met.

.

     2.  Another twist in the story concerns the rigid phenolic thermal insulation board used in the car park ceiling … which, as the evidence also shows, is exposed to direct view in many places …

In a short, brochure-type document produced by the European Phenolic Foam Association (EPFA): ‘Phenolic Foam Insulation – The Ultimate Insulation System for the Construction & Building Services Industry’, the following is stated with regard to the fire performance of this material …

‘ Toxic gas emission from phenolic foam is generally limited to carbon dioxide and carbon monoxide with very low levels of other gases.’

However, in a report produced by the National Research Council of Canada: ‘Toxicity and Smoke Aspects of Foamed Plastic Insulation – An Annotated Bibliography’ … the following abstracts can be found …

  • Toxicity of Off-Gases from Phenolic Rigid Foam

‘ A reference sample of phenolic rigid foam was evaluated for toxicity of off-gases, using various test conditions in the NASA-USF-PSC toxicity screening test method.  Test results show that the response of this material to the various test conditions is similar to that exhibited by the majority of other materials previously evaluated by this method.  That is, animal response times generally decreased with increasing fixed temperature, and with increasing airflow rate under rising temperature conditions.  The authors suggest that formaldehyde is one of the toxicants present although the amount of CO produced at 600°C or higher was enough to be lethal by itself.

  • Toxicity of Off-Gases from Thermal Insulation

‘ Toxicity test data on the off-gases from various thermal insulation materials are presented in this paper.  Under rising temperature without forced airflow test conditions, phenolic foams exhibited the shortest times to death, while polyisocyanurate, polyurethane and polystyrene foams exhibited the longest times to death.  The introduction of airflow significantly reduced time to death, apparently due to a higher degree of oxidation and more rapid delivery of toxicants.  The authors conclude that under the particular test conditions, plastic thermal insulations appear to exhibit less toxicity than cellulosic board and cellulose insulation, with polyimide and phenolic foams being the exceptions.

  • Relative Flammability and Toxicity of Thermal Insulation

‘ Relative flammability and relative toxicity data are presented for 30 samples of thermal insulation materials.  There appears to be no inherent, necessary compromise between flammability and toxicity in the selection of materials.  Cellulosic and plastics insulations appear to represent significantly different combinations of flammability and toxicity hazards, and require different approaches when planning and designing applications.  Polyurethane foam appeared to be significantly less toxic and slightly less flammable than wood and other cellulosic materials.  Polyisocyanurate foam seemed to be more toxic than polyurethane foam but still less toxic than the cellulosic materials.  Polystyrene foam exhibited the longest time to death while phenolic foam showed the second shortest time to death among the group of rigid foams evaluated.

  • Carbon Monoxide Production from Overheated Thermal Insulation Materials

‘ Carbon monoxide yields were obtained for selected thermal insulation materials.  The data are presented and discussed in this paper.  Among the rigid foamed plastics, phenolic gave the highest yield of CO under a rising temperature and no airflow test conditions.  Polyurethane foams based on propoxylated aromatic amino polyol appeared to produce less CO than polyurethane foams based on propoxylated trimethylolpropane polyol.  Under fixed temperatures of 800°C without airflow test conditions, similar results were obtained for the rigid foamed plastics.’

  • Toxicity of Pyrolysis Gases from Phenolic and Isocyanurate Rigid Foams

‘ Special reference samples of phenolic and isocyanurate rigid foams were evaluated for toxicity of pyrolysis gases, using 6 different test conditions of the USF toxicity screening test methods.  Under rising temperature conditions, phenolic foam appeared to be consistently more toxic than the isocyanurate foam.  CO level appears to be the factor, which is twice as high from the phenolic foam.  The temperatures corresponding to the times to death indicate that the toxicants were evolved below 500°C for phenolic and below 640°C for isocyanurate.  These are in agreement with that of the University of Pittsburgh (UP) data.  At a fixed temperature of 800°C, there appeared to be no difference in toxicity between the phenolic and isocyanurate foams, although the former tended to produce more carbon monoxide.’

  • Toxicity of Pyrolysis Gases from Phenolic, Isocyanurate and Polystyrene Rigid Foam Insulation

‘ Samples of phenolic, isocyanurate, and polystyrene rigid foam insulation were evaluated for toxicity of pyrolysis gases, using four different test conditions of the toxicity screening test method developed at the University of San Francisco.  The test conditions were 200 to 800°C rising temperature and 800°C fixed temperature, each without forced airflow and with 1 L/min airflow.  On the average over these four particular test conditions, phenolic foam appeared to exhibit the greatest toxicity and polystyrene foam appeared to exhibit the least toxicity.

.

As already discussed in an  earlier post , dated 2011-01-13 … we know that Carbon Monoxide (CO) is an odourless, colourless and toxic gas … and because it is impossible to see, taste or smell the toxic fumes, CO can kill before you are aware it is there.

So … it will be easy for Fire, Visible Smoke and Carbon Monoxide to spread upwards into the hospital wards and other areas of this building … in the event of a fire emergency.

.

This Hospital’s ‘Fire’ Problem & Its Solution

The ‘fire’ problem in this hospital has been allowed to fester for a number of years because the issues shown in the photographs above are either inadequately addressed … or not addressed at all … in Ireland’s Technical Guidance Document (TGD) B … a document which is intended merely to present some supporting guidance for operating Part B: ‘Fire Safety’, in the 2nd Schedule of the Building Regulations.

Unfortunately, all parties directly responsible for this hospital debacle are under the very mistaken impression that the guidance in Technical Guidance Document B is prescriptive regulation.  This is a major error !   Furthermore … TGD B is fundamentally flawed … and it is particularly inadequate when the building type is a health facility.

To Correct This ‘Fire’ Problem … a Fire Suppression System should immediately be installed in the basement car park.  At the same time, if not before … ALL Service Penetration Openings in the concrete floor slab should be properly sealed so that, during a fire incident, the passage of fire and smoke and CO into building spaces above the slab will be prevented.  And … the quality of workmanship, on site, must be high !

An appropriate number of Carbon Monoxide Detectors should be installed in the hospital wards and other areas above the concrete floor slab.

.

The ‘Institutional’ Problem

The procedure of having to submit so-called Compliance Reports with applications for Fire Safety Certificates, in Ireland, only confirms … and reinforces … the very mistaken impression in everybody’s minds that the guidance in Technical Guidance Document B is prescriptive regulation.

In the case of a different hospital … let me give you an example of a text contained in one such Compliance Report … submitted to an Irish Local Authority, sometime during 2004 …

Single Steps at Final Exit Doors

It is noted that Clause 1.4.3.4 of TGD-B is ambiguous vis-à-vis steps located on the line of final exit doors, i.e. as opposed to a condition where there is a step beyond the line of a door.  Accordingly, it is reasonable and appropriate to make reference to the current England and Wales Approved Document B (2000 Edition) for guidance on this issue in so far as Technical Guidance Document B is based on an early draft of the Approved Document.  It is noted that the UK AD-B in Clauses 6.15 and 6.21 specifically allow single steps at final exits provided they are located on the line of the doorway in question.  Furthermore, the recently issued Northern Ireland Technical Bulletin E (1994) also allows such steps, subject to the riser not exceeding 180mm.  On the basis of the foregoing, single steps are considered acceptable at the final exit doors subject to the riser not exceeding 180mm and the step being located on the line of the door.

This is mindless, incompetent nonsense … and it was accepted by the Local Authority.

How often, anymore, does anybody encounter a step … 180mm high, or of any height … at the front entrance to a new building ?   Building designers have finally understood the message that new buildings must be accessible-for-all … and a single step, in any situation, is a trip or a fall accident waiting to happen.  Now imagine the situation where people are attempting to evacuate an average office building, for example, during a fire emergency … and they encounter a single step at the final fire exit !?!   Now really stretch your imagination … and imagine where people are trying to evacuate a hospital !!??!!

FUBAR !!

The System is not only entirely dysfunctional … it is corrupt !

.

.

END

 

Enhanced by Zemanta

Stop Press ! … ISO 21542 on Accessibility-for-All Published !!

2012-03-25:  No news about this momentous development, yet, on the International Design and Disability Networks … (why is that ? – are they all asleep out there ?) … but International Standard  ISO 21542: ‘Building Construction – Accessibility and Usability of the Built Environment’  was finally published by the International Standards Organization (ISO) in December 2011 !   Even ISO, and national standards organizations, have been slow with an official notification.

This International Standard now provides building users, architects, designers, engineers, builders, building owners and managers, manufacturers, policy makers and legislators with the requirements and recommendations to create a Sustainable Built Environment which is Accessible.

The First Edition of ISO 21542, dated 2011-12-15, represents an agreement reached by strong consensus between different countries all over the world … an agreement patiently constructed and pieced together by a small, dedicated international group of Accessibility Experts.  As one of those experts, I am tremendously relieved that this main task has been accomplished … but the process must continue … there are still errors in the document … and the fire safety texts must be expanded.

This is also an agreement which signals that uniform implementation of the main provisions (accessibility-related) in the United Nations Convention on the Rights of Persons with Disabilities (UN CRPD) can commence across the globe, not just in the developed economic regions.

The purpose of this International Standard is to define how the built environment … in particular, public buildings … should be designed, constructed and managed to enable people to approach, enter, use, egress from and evacuate a building independently, in an equitable and dignified manner and to the greatest extent possible.

Colour image showing an Accessible Fire Evacuation Route Sign. From now on, Building Users should expect that these routes will be Accessible-for-All, throughout their full extent, until they reach a Place of Safety which is remote from the Building. Otherwise, they will be able to find accommodation in a suitable Area of Rescue Assistance along the route. Click to enlarge.
Colour image showing an Accessible Fire Evacuation Route Sign. From now on, Building Users should expect that these routes will be Accessible-for-All, throughout their full extent, until they reach a Place of Safety which is remote from the Building. Otherwise, they will be able to find accommodation in a suitable Area of Rescue Assistance along the route. Click to enlarge.

.

A new international understanding of ‘Building Accessibility’ is hereby established … ‘Access’ (approach, entry and use) can no longer be divorced from ‘Egress’ (in the normal course of events) and ‘Evacuation’ (in the event of an emergency).

The concept of ‘Access’, in isolation, and the role of the ‘Access Consultant’ are, therefore, outdated and obsolete !   And use of the word ‘Escape’, in any context, is to be firmly and rigorously discouraged !!

The intention of this International Standard is to meet the needs of the majority of people.  This goal is achieved by agreement on minimum standards of accessibility and usability which are generally accepted to accommodate diversities of age and the human condition.

.

In future … proper emphasis must be placed on Real and Effective Implementation of Accessibility-for-All in the built environment … to meet the needs of real people in all of our communities.

In the past … too many scarce human resources have been diverted into pointless discussions and arguments about accessibility design philosophies.  And, particularly in Europe, we have been far too fond of ‘talk’, instead of ‘action’ !   No more !!

.

ISO 21542 : 2011  applies to new and existing buildings.

IF this Standard’s requirements and recommendations are taken into consideration during the earliest stages of New Building Design … the costs of providing satisfactory accessibility and usability in a building will be minimal.

Yes, there are problems with improving the accessibility performance of Existing Buildings … just as there are problems, for example, with improving their energy performance.  However … creativity, design flexibility, and an in-depth understanding of the principles of Accessibility-for-All … will ensure that the functional requirements of this Standard are properly met.

Mindful of the  1964 Venice Charter  and other similar international instruments … accessibility must also be facilitated in Existing Buildings of Historical, Architectural and Cultural Importance.  In such cases, it will be necessary for national authorities having jurisdiction to allow some relaxation of the requirements in this International Standard … as well as to proactively recommend appropriate alternative accessibility measures.

.

This new approach to Accessibility-for-All in the Built Environment … as set down in ISO 21542 … was directly informed by Preamble Paragraph (g) and Articles 9, 10 and 11 of the United Nations Convention on the Rights of Persons with Disabilities (UN CRPD).

At the time of writing … the UN CRPD has been ratified by the European Union (EU) and 109 Other Countries.

An Important Note for Parties to the Convention which is entirely outside the scope of ISO 21542, and standardization generally … but very relevant to the implementation, for example, of Article 11 at national level in the ratifying Countries and EU Member States …

UN CRPD  Article 12 – Equal Recognition Before The Law

1.   States Parties reaffirm that persons with disabilities have the right to recognition everywhere as persons before the law.

2.   States Parties shall recognize that persons with disabilities enjoy legal capacity on an equal basis with others in all aspects of life.

3.   States Parties shall take appropriate measures to provide access by persons with disabilities to the support they may require in exercising their legal capacity.

4.   States Parties shall ensure that all measures that relate to the exercise of legal capacity provide for appropriate and effective safeguards to prevent abuse in accordance with international human rights law.  Such safeguards shall ensure that measures relating to the exercise of legal capacity respect the rights, will and preferences of the person, are free of conflict of interest and undue influence, are proportional and tailored to the person’s circumstances, apply for the shortest time possible and are subject to regular review by a competent, independent and impartial authority or judicial body.  The safeguards shall be proportional to the degree to which such measures affect the person’s rights and interests.

5.   Subject to the provisions of this article, States Parties shall take all appropriate and effective measures to ensure the equal right of persons with disabilities to own or inherit property, to control their own financial affairs and to have equal access to bank loans, mortgages and other forms of financial credit, and shall ensure that persons with disabilities are not arbitrarily deprived of their property.

.

ISO 21542 : 2011  is available from the International Standards Organization (ISO) at … www.iso.org/

The Official Abstract on the ISO WebSite states …

ISO 21542 : 2011  specifies a range of requirements and recommendations for many of the elements of construction, assemblies, components and fittings which comprise the built environment.  These requirements relate to the constructional aspects of access to buildings, to circulation within buildings, to egress from buildings in the normal course of events and evacuation in the event of an emergency.  It also deals with aspects of accessibility management in buildings.

ISO 21542 : 2011  contains provisions with respect to features in the external environment directly concerned with access to a building or group of buildings from the edge of the relevant site boundary or between such groups of buildings within a common site.  It does not deal with those elements of the external environment, such as public open spaces, whose function is self-contained and unrelated to the use of one specific building, nor does it deal with single-family dwellings, other than those circulation spaces and fittings that are common to two or more such dwellings.

.

.

END

Enhanced by Zemanta

OVE ARUP & Hong Kong’s New Fire Safety Code of Practice

2012-02-18:  It will be of interest to people in this part of the world that Hong Kong has introduced a New Code of Practice on Fire Safety in Buildings, which will come into effect from 1 April 2012.  The reason for this interest will be strange and unusual …

Hong Kong Buildings Department

2011 Hong Kong Code of Practice for Fire Safety in Buildings

Click the Link Above to read and/or download PDF File (3.96 Mb)

The following extract from the Foreward (paragraph #3) to this Code of Practice explains how it came to be developed … and then issued back in September 2011 …

This Code of Practice may be cited as the Code of Practice for Fire Safety in Buildings.  It is prepared and issued by the Buildings Department on the basis of the consultancy study on fire engineering approach and fire safety in buildings.  The consultancy study was conducted by Ove Arup & Partners Hong Kong Ltd., commissioned by the Buildings Department, and was supervised by a Steering Committee comprising representatives of professional institutions and other stakeholders of the building industry, as well as other Government Departments.

.

It so happens that, here, a few weeks ago … I was wondering how the United Nations Convention on the Rights of Persons with Disabilities (CRPD) was being implemented in a number of countries which had ratified it.  China ratified the Convention on 1 August 2008.  Once again, this is Article 11 …

UN CRPD  Article 11 – Situations of Risk & Humanitarian Emergencies

States Parties shall take, in accordance with their obligations under international law, including international humanitarian law and international human rights law, all necessary measures to ensure the protection and safety of persons with disabilities in situations of risk, including situations of armed conflict, humanitarian emergencies and the occurrence of natural disasters.

[ Note:  An outbreak of fire in a building is a situation of serious risk for all vulnerable building users ! ]

So … what has been the response of Hong Kong to this issue … and to the voluntary obligation which China has accepted, under International Law, to comply with Article 11 of the UN CRPD ?

The issue has been completely ignored in the New Code of Practice !

.

.

END

Enhanced by Zemanta

2012 Review of Part B & TGD B – Irish Building Regulations

2012-03-02:  Please bear with me while I update you at the start of this post … rather than at the end, which would be more usual here … and logical.

[ In Ireland … a related problem, which continues to fester and cause a great nuisance in an everyday work environment … concerns the lack of proper, i.e. formal, recognition of electronic communications, and information in an electronic format, by public and private organizations … in spite of the following very clear legal text …

2000 Electronic Commerce Act (No. 27 of 2000)

Section 9 – Electronic Form not to Affect Legal Validity or Enforceability

Information (including information incorporated by reference) shall not be denied legal effect, validity or enforceability solely on the grounds that it is wholly or partly in electronic form, whether as an electronic communication or otherwise. ]

.

Yesterday afternoon (1 March 2012), we received the following e-mail communication from the Department of Environment, Community & Local Government (DECLG)

Folks,

Could you please send me your submissions in either Microsoft Word or Excel as it it easier to copy and paste into the format that is required , it is proving rather difficult to copy from a PDF document.

Thank You

Claire Darragh, Architecture / Building Standards, DECLG.

.

I immediately replied …

Dear Claire,

Further to your informal e-mail message, which we received just a short while ago …

Please note that this is not an acknowledgement that the FireOx International Submission was received by the Department … and we certainly do not wish that you copy and paste anything relating to its contents anywhere else.

IF this is a Proper Public Consultation Process … you must adapt internal DECLG systems to suit the Submissions !   We will be communicating with the Minister’s Office concerning this issue.

Once again, I would ask you to properly acknowledge receipt of our Submission, dated 2012-02-14.

.

In connection with the original FireOx International Submission … I would also like to take this opportunity to advise you that:

  • Due to an error in ISO (International Standards Organization) … the publication of ISO 21542: ‘Building Construction – Accessibility and Usability of the Built Environment’, on 12 December 2011, was not notified to people directly involved in its development and drafting, or to the participating national standards organizations ; 

and

  • In order to avoid the wide confusion which the term ‘Fire-Induced Progressive Collapse’ is continuing to cause at international level … the preferred term is now Fire-Induced Progressive Damage.

.

I have amended our Submission accordingly.

Kind regards.

C. J. Walsh, FireOx International – Ireland, Italy & Turkey.

.

.

2012-02-18:  The following is the text of  FireOx International’s Submission, dated 14 February 2012, to the Department of the Environment, Community & Local Government (DECLG) in Dublin … concerning the current review of the Irish Building Regulations Part B & TGD B … including, for good measure, some initial and very pertinent comments on the Irish Building Control Regulations.

None of these comments will come as any surprise to regular visitors here.

It should also be noted that the same comments are just as relevant in the case of the British (England & Wales) Building Regulations, Part B and Approved Document (AD) B !

.

Ms. Claire Darragh, Architecture & Building Standards Section, DECLG.

Dear Claire,

Thank you for this opportunity to advise the Department on some urgent and necessary improvements to Part B: ‘Fire Safety’ of the 2nd Schedule to the Building Regulations in Ireland … and its supporting Technical Guidance Document (TGD) B.

1.  Some Initial Comments

  • The continuing debacle of the Priory Hall Apartment Complex, in Donaghmede Dublin 13, is just the tip of a very large iceberg in Ireland.  Yet, when we now hear that there will be a ‘risk-based’ approach to Septic Tank Inspections, instead of an approach which involves inspecting all septic tanks … independently, competently and thoroughly … it is clear that the Minister, and senior officials in his Department, have failed to learn any lessons from ‘Priory Hall’.

What was happening on Irish construction sites during the Celtic Tiger boom years … has been happening for twenty years all over the country … more precisely, since the introduction of legal national building regulations in 1991, with NO effective building control … and, before that again, in those parts of the country outside of the major urban areas having legal building bye-laws AND effective building control, i.e. mandatory inspections by competent local authority personnel at the foundation level and drainage level of ALL projects … and, depending on the type of project, occasional or frequent inspections above ground level.

Over the years, local authority officials who carried out building bye-law inspections accumulated a considerable wealth of knowledge and understanding about local construction conditions and practices.  This valuable resource, widely used by the construction industry at the time, has now been diluted and discarded.

PLEASE LEARN THE LESSONS FROM ‘PRIORY HALL’ !!

In connection with ALL Applications for Fire Safety Certificates (Part B) and Disability Access Certificates (Part M) … competent and thorough inspections must, from now on, be carried out by local authority personnel to confirm proper implementation of Part B & M, respectively, of the 2nd Schedule to the Building Regulations.

Furthermore … while on site, local authority personnel must not be discouraged, or restricted, from dealing with any other Parts of the 2nd Schedule to the Building Regulations.  Under the present dysfunctional system, important horizontal linkages between different Parts of the 2nd Schedule are being widely disregarded and ignored, e.g. between Parts B & D, between Parts B & M, and between Parts B & A … or between Parts M & D, etc., etc !

  • European Union (EU) Council Directive 89/106/EEC has been repealed … and, instead, we now have EU Regulation No 305/2011 of the European Parliament and of the Council, of 9 March 2011, laying down Harmonised Conditions for the Marketing of Construction Products.

Unlike the earlier EU Directive … this Regulation, applicable in all EU Member States, is binding in its entirety.

And although Annex I of EU Regulation 305/2011 will enter into force from 1 July 2013 … the Department should now prepare for, and slowly begin the process of, incorporating all of the Annex I Basic Requirements for Construction Works into the 2nd Schedule of the Irish Building Regulations.

SEE BELOW …

.

2.  Firefighter Safety

Fully consistent with Basic Requirement for Construction Works 2(e), in Annex I of EU Regulation No. 305/2011 … Revise Part B Requirement 5 to read as follows …

B5  Firefighter Safety, and Access and Facilities for the Fire Service

A building shall be so designed and constructed that the safety of firefighters is adequately considered and, in the event of an outbreak of fire, that there is adequate provision for access for fire appliances and such other facilities as may be required to assist the fire service in the protection of life and property.

Two examples of issues which should be highlighted in a relevant revision/addition to TGD B’s Guidance Text:

  • The incorporation, in building designs, of alternative safe means of approach towards the scene of a fire by firefighters ;
  • The provision of wider staircases in buildings in order to facilitate the recovery of an injured/impaired firefighter during the course of firefighting operations.

.

3.  Protection of Vulnerable Building Users from Fire

The European Union ratified the United Nations Convention on the Rights of Persons with Disabilities (CRPD) on 23 December 2010.  Ireland has not yet ratified the Convention.

However … fully consistent with Ireland’s legal obligation, under Article 4.3 of the Treaty on European Union (TEU), to co-operate fully with EU Institutions in their implementation of this UN Convention … Revise Part B Requirement 1 to read as follows …

B1  Means of Evacuation in the Event of an Outbreak of Fire

A building shall be so designed and constructed that the protection of vulnerable building users is adequately considered and, in the event of an outbreak of fire, that there are adequate and accessible means of evacuation from the building to a place of safety remote from the building, capable of being safely and effectively used.

[ Use of the word ‘escape’, in the context of emergencies, should be strongly discouraged at all times. ]

Concerning TGD B’s Guidance Text … reference to ISO 21542: ‘Building Construction – Accessibility and Usability of the Built Environment’ will be more than sufficient.

.

Specifically relating to Adequate Protection of Vulnerable Building Users from Fire

NOTE WELL THAT BS 9999 (AND BS 5588:PART EIGHT)  IS (ARE)  ENTIRELY UNFIT FOR PURPOSE !!

Please carefully examine the attached PDF File – My Note for the National Standards Authority of Ireland:  ‘BS 9999:2008 & BS 8300:2009 – Impacts on Accessibility Design in Ireland & Implications for ISO Accessibility & Fire Safety Standards’ , dated June 2009.

.

4.  TGD B’s Appendix A – Performance of Materials and Structures

2 Important Notes should be added to Paragraph A21 – Structural Fire Design

  • In complying with Part B, reference should also be made to Part A of the 2nd Schedule of the Building Regulations, particularly Requirement A3 – Disproportionate Collapse ;

and

  • In order to show that a Fire Protection Material/Product/System for Structural Elements properly complies with Part D … it is also necessary, besides showing that it has been adequately fire tested, to show that the material/product/system is durable over a specified, reasonably long life cycle … and that it can adequately resist mechanical damage during construction of the building and, in the event of an outbreak of fire, during the course of that fire incident.

.

Specifically relating to Steel Structural Performance in Fire

You should be aware that Table A1 and Table A2 are only appropriate for use by designers in the case of single, isolated steel structural elements.

In steel structural frame systems, no consideration is given in the Tables to adequate fire protection of connections … or limiting the thermal expansion (and other types of distortion) in fire of steel structural elements … in order to reduce the adverse effects of one steel element’s behaviour on the rest of the frame and/or adjoining non-loadbearing fire resisting elements of construction.

In the case of steel structural frame systems, therefore, the minimum fire protection to be afforded to ALL steel structural elements, including connections, should be 2 Hours.  Connections should also be designed and constructed to be sufficiently robust during the course of a fire incident.  This one small revision will contribute greatly towards preventing Fire-Induced Progressive Damage in buildings … a related, but different, structural concept to Disproportionate Damage …

Disproportionate Damage

The failure of a building’s structural system  (i) remote from the scene of an isolated overloading action;  and (ii) to an extent which is not in reasonable proportion to that action.

Fire-Induced Progressive Damage

The sequential growth and intensification of structural distortion and displacement, beyond fire engineering design parameters, and the eventual failure of elements of construction in a building – during a fire and the ‘cooling phase’ afterwards – which, if unchecked, will result in disproportionate damage, and may lead to total building collapse.

.

With regard to the above … please carefully examine these 2 Series of Posts on FireOx International’s Technical Blog ( www.cjwalsh.ie ), beginning on the dates indicated …

  • 2011-10-25:  NIST’s (2005) Recommendations on the 9-11 WTC Building Collapses … GROUP 1. Increased Structural Integrity – Recommendations 1, 2 & 3 (out of 30) ;

and

  • 2012-01-18:  Progressive Collapse of WTC 7 – 2008 NIST Recommendations – Part 1 of 2 … GROUP 1. Increased Structural Integrity – Recommendation A … and GROUP 2. Enhanced Fire Endurance of Structures – Recommendations B, C, D & E (out of 13).

.

5.  TGD B’s Appendix F – Reference Standards

Add this Important New Standard …

  • ISO 21542 : 2011     Building Construction – Accessibility and Usability of the Built Environment

.

6.  TGD B’s Appendix G – Reference Publications

Add these Two Important Publications …

  • NIST (National Institute of Standards and Technology).  September 2005.  Federal Building and Fire Safety Investigation of the World Trade Center Disaster: Final Report on the Collapse of the World Trade Center Towers.  NIST NCSTAR 1.  Gaithersburg, MD, USA.

and

  • NIST (National Institute of Standards and Technology).  August 2008.  Federal Building and Fire Safety Investigation of the World Trade Center Disaster: Final Report on the Collapse of World Trade Center Building 7.  NIST NCSTAR 1A.  Gaithersburg, MD, USA.

.

Should you wish to receive further information on any of my comments … please consult FireOx International’s Technical Blog at  www.cjwalsh.ie … or contact me directly.

Please acknowledge receipt of this e-mail communication.

.

Kind regards.

C. J. Walsh, FireOx International – Ireland, Italy & Turkey.

.

.

END

Enhanced by Zemanta

Progressive Collapse of WTC 7 – 2008 NIST Recommendations – Part 2 of 2

1st Series of Posts on the 2005 NIST WTC 1 & 2 Collapse Recommendations … which began towards the end of 2011 …

2011-10-25:  NIST’s Recommendations on the 9-11 WTC Building Collapses … GROUP 1. Increased Structural Integrity – Recommendations 1, 2 & 3 (out of 30)

Previous Post in this New Series …

2012-01-18:  Progressive Collapse of WTC 7 – 2008 NIST Recommendations – Part 1 of 2 … GROUP 1. Increased Structural Integrity – Recommendation A … and GROUP 2. Enhanced Fire Endurance of Structures – Recommendations B, C, D & E (out of 13)

.

2012-01-22:  SOME PRELIMINARY COMMENTS …

  1.     Keeping my ear closely to the ground … I hear you wondering: “So … how did the fires actually start in World Trade Center Building 7 ?”

Extracts from the Executive Summary (pages xxxi – xxxv) – 2008 NIST NCSTAR 1A …

[ Refer back to the WTC 1 & 2 Collapse Damage Plan in the previous post.]

The fires in WTC Building 7 were ignited as a result of the impact of debris from the collapse of WTC Tower 1, which was approximately 110 metres to the south.  The debris also caused some structural damage to the south-west perimeter of WTC 7.  The fires were ignited on at least 10 floors;  however, only the fires on Floors 7 to 9 and 11 to 13 grew and lasted until the time of building collapse.  These uncontrolled fires had characteristics similar to those that have occurred previously in tall buildings.  Their growth and spread were consistent with ordinary building content fires.  Had a water supply for the automatic sprinkler system been available and had the sprinkler system operated as designed, it is likely that the fires in WTC 7 would have been controlled, and the collapse prevented.  However, the collapse of WTC 7 highlights the importance of designing fire resisting structures for situations where sprinklers are not present, do not function (e.g. due to disconnected or impaired water supply), or are overwhelmed.

and …

There were no serious injuries or fatalities, because the estimated 4,000 occupants of WTC 7 reacted to the airplane impacts on the two WTC Towers and began evacuating before there was significant damage to WTC 7.  The occupants were able to use both the elevators and the stairs, which were as yet not damaged, obstructed, or smoke-filled.  Evacuation of the building took just over an hour.  The potential for injuries to people leaving the building was mitigated by building management personnel holding the occupants in the lobby until they identified an exit path that was safe from the debris falling from WTC Tower 1.  The decisions not to continue evaluating the building and not to fight the fires were made hours before the building collapsed, so no emergency responders were in or near the building when the collapse occurred.

and …

The design of WTC 7 was generally consistent with the New York City Building Code of 1968 (NYCBC), with which, by policy, it was to comply.  The installed thickness of the thermal insulation on the floor beams was below that required for unsprinklered or sprinklered buildings, but it is unlikely that the collapse of WTC 7 could have been prevented even if the thickness had been consistent with building code requirements.  The stairwells were narrower than those required by the NYCBC, but, combined with the elevators, were adequate for a timely evacuation on 11 September 2001, since the number of building occupants was only about half that expected during normal business hours.

The collapse of WTC 7 could not have been prevented without controlling the fires before most of the combustible building contents were consumed.  There were two sources of water (gravity-fed overhead tanks and the city water main) for the standpipe and automatic sprinkler systems serving Floor 21 and above, and some of the early fires on those upper floors might have actually been controlled in this manner.  However, consistent with the NYCBC, both the primary and back-up source of water for the sprinkler system in the lower 20 floors of WTC 7 was the city water main.  Since the collapses of the WTC Towers had damaged the water main, there was no water available (such as the gravity-fed overhead tanks that supplied water to Floor 21 and above) to control those fires that eventually led to the building collapse.

Link to read and/or download a copy of the 2008 NIST NCSTAR 1A Report … www.fireox-international.eu/fire/structdesfire.htm 

.

  2.     On a separate subject and quite by chance … a few days ago, I was invited to review a technical paper for a reputable international fire engineering journal (which shall remain nameless).  The paper was discussing a certain aspect of steel column critical temperatures.  After three days, I replied to the journal’s editor as follows …

2012-01-18.

Most regrettably, I must decline your invitation to review Paper XYZ.

The ‘critical temperature’ approach to the fire engineering design of steel-framed structures is deeply flawed … and obsolete.

C. J. Walsh, FireOx International – Ireland, Italy & Turkey.

The ‘critical temperature’ approach is antiquated … and this nonsense has got to stop !   NOW … would be the best time !!

.

  3.     In the last post, I wrote …

Structural Fire Engineering is concerned with those aspects of fire engineering which relate to structural design for fire, and the complex architectural interaction between a building’s structure and fabric, i.e. non-structure, under conditions of fire and its immediate aftermath.

Indeed !   But, more needs to be added …

I hope it is becoming clearer now that Structural Fire Engineering is not just ambient structural engineering with a few extra ‘bells and whistles’ grafted on … in token consideration of what could happen in fire conditions, i.e. at high temperatures.

[ If, in some jurisdictions, there are no legal requirements to add even those ‘bells and whistles’ … then, typically, even they will be omitted ! ]

This brings me right back to the typical education of Civil/Structural Engineers;  because:  (i) they exit the educational system with little understanding of anything beyond ‘structure’ … in other words, a ‘real’ building, which also comprises ‘fabric’, i.e. non-structure, is a mystery to them;  and (ii) they have difficulty reading architectural drawings … which is why a walk-through inspection of a building, as it is nearing completion, is much preferred over a detailed discussion about drawings at the most appropriate stage, which is well before construction commences … when faults can be readily identified and easily rectified !

In ambient conditions … the architectural interaction between a building’s structure and fabric is difficult, not being entirely static.  Before the surface finishes have been applied, it is immediately obvious when this interaction has been properly ‘designed’, and looks neat and tidy … or, on the vast majority of construction sites, when this interaction is a ‘traffic accident’, and the results are desperately ugly … and you know that they can’t apply the surface finishes quickly enough in order to hide everything from view !

In fire conditions … this architectural interaction between building fabric and structure is complex, certainly very dynamic … and fluid !

It would be more appropriate to think of Structural Fire Engineering as ‘Design in the Hot Form’ … which is a completely different mindset.

It is essential, therefore, that Fire Engineers understand ‘real’ buildings … most importantly, the ‘design’ of real buildings … and, that they know which end is ‘up’ on a real construction site !!   See NIST WTC 7 Recommendation L below.

.

  4.     Since the collapse of WTC Building 7 on 11 September 2001, it has been generally assumed that Fire-Induced Progressive Collapse is a large-scale, macro-phenomenon only.  But, believe it or not, this phenomenon has also been observed at micro-level in small building types.

In fact … Progressive Collapse was already receiving sporadic attention, in Ireland, as far back as the 1980’s …

  • As organizer of the 1987 Dublin International Fire Conference: ‘Fire, Access & Safety in Residential Buildings’, I requested that the following Paper be presented … ‘Design against Progressive Collapse in Fire’ … by Dr. Willie Crowe, who was Head of Construction Technology, in the old Institute for Industrial Research & Standards (IIRS) in Ireland.  He later became Manager of the Irish Agrément Board (IAB).  Those were the days … and Willie really knew his stuff !

Mr. Noel C. Manning, of FireBar in Ireland (www.firebar.ie),  and I both contributed to the development of his Paper.

And now is as good a time as any to give full credit to Noel Manning for his innovative approach to Structural Fire Engineering back in the early 1980’s.  He’s a ‘hard man’ … a term that we use for some special people in Ireland !

Link to the Dublin International Fire Conferences, and a copy of this Paper … www.fireox-international.eu/fire/dublinfire.htm 

  • For approximately 12 years from the mid-1980’s, I was a Member of the National Masonry Panel – the National Standards Authority of Ireland (NSAI) Masonry Standards Advisory Committee.  A small, but substantial, text on Fire-Induced Progressive Collapse in Buildings was included, by me, in the following standard … Irish Standard 325: Code of Practice for Use in Masonry – Part 2: Masonry Construction (1995).  Appendix A – Determination of Movement in Masonry.  A.3 – Thermal Movement.  Once again … those were the days … when I was the only architect in a sea of engineers !!   Not a pretty experience.

.

  5.     What next ?   A final draft of the International CIB W14 Research WG IV Reflection Document on Fire-Induced Progressive Collapse will be completed in time for circulation to all CIB W14 members before the end of March 2012 … well in time for the next CIB W14 Meetings in Greece, near the end of April 2012.

.

2008 NIST WTC 7 RECOMMENDATIONS  (Final Report NCSTAR 1A)

5.1.3     GROUP 3.  New Methods for Fire Resisting Design of Structures

The procedures and practices used in the fire resisting design of structures should be enhanced by requiring an objective that uncontrolled fires result in burnout without partial or global (total) collapse.  Performance-based methods are an alternative to prescriptive design methods.  This effort should include the development and evaluation of new fire resisting coating materials and technologies, and evaluation of the fire performance of conventional and high-performance structural materials.

NIST WTC 7 Recommendation F  (NCSTAR 1  Recommendation 8).

NIST recommends that the fire resistance of structures be enhanced by requiring a performance objective that uncontrolled building fires result in burnout without partial or global (total) collapse.  Such a provision should recognize that sprinklers could be compromised, non-operational, or non-existent.  Current methods for determining the fire resistance of structural assemblies do not explicitly specify a performance objective.  The rating resulting from current test methods indicates that the assembly (component or sub-system) continued to support its superimposed load (simulating a maximum load condition) during the test exposure without collapse.  Model Building Codes:  This Recommendation should be included in the national model building codes as an objective, and adopted as an integral pert of the fire resistance design for structures.  The issue of non-operational sprinklers could be addressed using the existing concept of Design Scenario 8 of NFPA 5000, where such compromise is assumed and the result is required to be acceptable to the Authority Having Jurisdiction (AHJ).  Affected Standards:  ASCE-7, AISC Specifications, ACI 318, and ASCE/SFPE 29.

Relevance to WTC 7:  Large, uncontrolled fires led to failure of a critical column and consequently the complete collapse of WTC 7.  In the region of the collapse initiation (i.e. on the east side of Floor 13), the fire had consumed virtually all of the combustible building contents, yet collapse was not prevented.

.

NIST WTC 7 Recommendation G  (NCSTAR 1  Recommendation 9).

NIST recommends the development of:  (1) performance-based standards and code provisions, as an alternative to current prescriptive design methods, to enable the design and retrofit of structures to resist real building fire conditions, including their ability to achieve the performance objective of burnout without structural or local fire collapse;  and (2) the tools, guidelines, and test methods necessary to evaluate the fire performance of the structure as a whole system.  Standards development organizations, including the American Institute of Steel Construction, have already begun developing performance-based provisions to consider the effects of fire in structural design.

a.     Standard methodology, supported by performance criteria, analytical design tools, and practical design guidance;  related building standards and codes for fire resistance design and retrofit of structures, working through the consensus process for nationwide adoption;  comprehensive design rules and guidelines;  methodology for evaluating thermo-structural performance of structures;  and computational models and analysis procedures for use in routine design practice.

b.     Standard methodology for specifying multi-compartment, multi-floor fire scenarios for use in the design and analysis of structures to resist fires, accounting for building-specific conditions such as geometry, compartmentation, fuel load (e.g. building contents and any flammable fuels such as oil and gas), fire spread, and ventilation;  and methodology for rating the fire resistance of structural systems and barriers under realistic design-basis fire scenarios.

c.     Publicly available computational software to predict the effects of fires in buildings – developed, validated, and maintained through a national effort – for use in the design of fire protection systems and the analysis of building response to fires.  Improvements should include the fire behaviour and contribution of real combustibles;  the performance of openings, including door openings and window breakage, that controls the amount of oxygen available to support the growth and spread of fires and whether the fire is fuel-controlled or ventilation-controlled;  the floor-to-floor flame spread;  the temperature rise in both insulated and un-insulated structural members and fire barriers;  and the structural response of components, sub-systems, and the total building system due to the fire.

d.     Temperature-dependent thermal and mechanical property data for conventional and innovative construction materials.

e.     New test methods, together with associated conformance assessment criteria, to support the performance-based methods for fire resistance design and retrofit of structures.  The performance objective of burnout without collapse will require the development of standard fire exposures that differ from those currently used.

There is a critical gap in knowledge about how structures perform in real fires, particularly concerning: the effects of fire on the entire structural system (including thermal expansion effects at lower temperatures);  interaction between the sub-systems, elements, and connections;  and scaling of fire test results to full-scale structures (especially for structures with long-span floor systems).

Relevance to WTC 7:  A performance-based assessment of the effects of fire on WTC 7, had it considered all of the relevant thermal effects (e.g. thermal expansion effects that occur at lower temperatures), would have identified the vulnerability of the building to fire-induced progressive collapse and allowed alternative designs for the structural system.

.

5.1.4     GROUP 4.  Improved Active Fire Protection

Active fire protection systems (i.e. sprinklers, standpipes/hoses, fire alarms, and smoke management systems) should be enhanced through improvements to the design, performance, reliability, and redundancy of such systems.

NIST WTC 7 Recommendation H  (NCSTAR 1  Recommendation 12).

NIST recommends that the performance, and possibly the redundancy and reliability of active fire protection systems (sprinklers, standpipes/hoses, fire alarms, and smoke management systems), in buildings be enhanced to accommodate the greater risks associated with increasing building height and population, increased use of open spaces, high-risk building activities, fire department response limits, transient fuel loads, and higher threat profile.

Reliability is affected by (a) redundancy, such that when one water supply is out of service (usually for maintenance), the other interconnected water supply can continue to protect the building and its occupants;  (b) automatic operation of water supply systems (not only for starting fire pumps but also for testing and tank replenishment, with appropriate remote alarms to the fire department and local alarms for notifying emergency personnel);  and (c) the use of suitable equipment and techniques to regulate unusual pressure considerations.

Relevance to WTC 7:  No water was available for the automatic suppression systems on the lower 20 storeys of WTC 7, once water from street-level mains was disrupted.  This lack of reliability in the source of the primary and secondary water supplies allowed the growth and spread of fires that ultimately resulted in collapse of the building.

.

5.1.5     GROUP 6.  Improved Emergency Response

Technologies and procedures for emergency response should be improved to enable better access to buildings, response operations, emergency communications, and command and control in large-scale emergencies.

NIST WTC 7 Recommendation I  (NCSTAR 1  Recommendation 24).

NIST recommends the establishment and implementation of codes and protocols for ensuring effective and uninterrupted operation of the command and control system for large-scale building emergencies.

a.     State, local, and federal jurisdictions should implement the National Incident Management System (NIMS).  The jurisdictions should work with the Department of Homeland Security to review, test, evaluate, and implement an effective unified command and control system.  NIMS addresses interagency co-ordination and establishes a response matrix – assigning lead agency responsibilities for different types of emergencies, and functions.  At a minimum, each supporting agency should assign an individual to provide co-ordination with the lead agency at each incident command post.

b.     State, local, and federal emergency operations centres (EOC’s) should be located, designed, built, and operated with security and operational integrity as a key consideration.

c.     Command posts should be established outside the potential collapse footprint of any building which shows evidence of large multi-floor fires or has serious structural damage.  A continuous assessment of building stability and safety should be made in such emergencies to guide ongoing operations and enhance emergency responder safety.  The information necessary to make these assessments should be made available to those assigned responsibility (see related Recommendations 15 and 23 in NIST NCSTAR 1).

d.     An effective command system should be established and operating before a large number of emergency responders and apparatus are dispatched and deployed.  Through training and drills, emergency responders and ambulances should be required to await dispatch requests from the incident command system and not to self-dispatch in large-scale emergencies.

e.     Actions should be taken via training and drills to ensure a co-ordinated and effective emergency response at all levels of the incident command chain by requiring all emergency responders that are given an assignment to immediately adopt and execute the assignment objectives.

f.     Command post information and incident operations data should be managed and broadcast to command and control centres at remote locations so that information is secure and accessible by all personnel needing the information.  Methods should be developed and implemented so that any information that is available at an interior information centre is transmitted to an emergency responder vehicle or command post outside the building.

Relevance to WTC 7:  (1) The New York City Office of Emergency Management (OEM) was located in WTC 7 and was evacuated before key fire ground decisions had to be made.  The location of OEM in WTC 7, which collapsed due to ordinary building fires, contributed to the loss of robust interagency command and control on 11 September 2001.  (2) Due to the collapse of the WTC Towers and the loss of responders and fire control resources, there was an evolving site leadership during the morning and afternoon.  Key decisions (e.g. not to fight the fires in WTC 7 and to turn off power to the Con Edison substation) were reasonable and would not have changed the outcome on 11 September 2001, but were not made promptly.  Under different circumstances (e.g. if WTC 7 had collapsed sooner and firefighters were still evaluating the building condition), the outcome could have been very different.

.

5.1.6     GROUP 7.  Improved Procedures and Practices

The procedures and practices used in the design, construction, maintenance, and operation of buildings should be improved to include encouraging code compliance by non-governmental and quasi-governmental entities, adoption and application of evacuation and sprinkler requirements in codes for existing buildings, and retention and availability of building documents over the life of a building.

NIST WTC 7 Recommendation J  (NCSTAR 1  Recommendation 27).

NIST recommends that building codes incorporate a provision that requires building owners to retain documents, including supporting calculations and test data, related to building design, construction, maintenance, and modifications over the entire life of the building.*  Means should be developed for off-site storage and maintenance of the documents.  In addition, NIST recommends that relevant information be made available in suitably designed hard copy or electronic formats for use by emergency responders.  Such information should be easily accessible by responders during emergencies.

[ * F-12  The availability of inexpensive electronic storage media and tools for creating large searchable databases makes this feasible.]

Relevance to WTC 7:  The efforts required in locating and acquiring drawings, specifications, tenant layouts, and material certifications, and especially shop fabrication drawings, significantly lengthened the investigation into the collapse of WTC 7.

.

NIST WTC 7 Recommendation K  (NCSTAR 1  Recommendation 28).

NIST recommends that the role of the ‘Design Professional in Responsible Charge’* be clarified to ensure that:  (1) all appropriate design professionals (including, e.g. the fire protection engineer) are part of the design team providing the highest standard of care when designing buildings employing innovative or unusual fire safety systems;  and (2) all appropriate design professionals (including, e.g. the structural engineer and the fire protection engineer) are part of the design team providing the highest standard of care when designing the structure to resist fires, in buildings that employ innovative or unusual structural and fire safety systems.

[ * F-13  In projects involving a design team, the ‘Design Professional in Responsible Charge’ – usually the lead architect – ensures that the team members use consistent design data and assumptions, co-ordinates overlapping specifications, and serves as the liaison between the enforcement and reviewing officials and the owner.  This term is defined in the International Building Code (IBC) and in the International Code Council’s Performance Code for Buildings and Facilities (where it is the Principal Design Professional).]

Relevance to WTC 7:  Following typical practice, none of the design professionals in charge of the WTC 7 Project (i.e. architect – structural engineer – fire protection engineer) was assigned the responsibility to explicitly evaluate the fire performance of the structural system.  Holistic consideration of thermal and structural factors during the design or review stage could have identified the potential for the failure and might have prevented the collapse of the building.

.

5.1.7     GROUP 8.  Education and Training

The professional skills of building and fire safety professionals should be upgraded through a national education and training effort for fire protection engineers, structural engineers, and architects.  The skills of building regulatory and fire service personnel should also be upgraded to provide sufficient understanding and the necessary skills to conduct the review, inspection, and approval tasks for which they are responsible.

NIST WTC 7 Recommendation L  (NCSTAR 1  Recommendation 29).

NIST recommends that continuing education curricula be developed, and programmes be implemented for:  (1) training fire protection engineers and architects in structural engineering principles and design;  and (2) training structural engineers, architects, fire protection engineers, and code enforcement officials in modern fire protection principles and technologies, including the fire resisting design of structures;  and (3) training building regulatory and fire service personnel to upgrade their understanding and skills to conduct the review, inspection, and approval tasks for which they are responsible.  The outcome would further the integration of the disciplines in effective fire-safe design of buildings.

Relevance to WTC 7:  Discerning the fire-structure interactions that led to the collapse of WTC 7 required research professionals with expertise in both disciplines.  Assuring the safety of future buildings will require that participants in the design and review processes possess a combined knowledge of fire science, materials science, heat transfer, and structural engineering, and design.

.

NIST WTC 7 Recommendation M  (NCSTAR 1  Recommendation 30).

NIST recommends that academic, professional short-course, and web-based training materials in the use of computational fire dynamics and thermo-structural analysis tools be developed and delivered to strengthen the base of available technical capabilities and human resources.

Relevance to WTC 7:  NIST stretched the state-of-the-art in the computational tools needed to reconstruct a fire-induced progressive collapse.  This enabled identification of the critical processes that led to that collapse.  Making these expanded tools and derivative, validated, and simplified modelling approaches usable by practitioners could prevent future disasters.

.

.

END

Enhanced by Zemanta

Post-9/11 & Post-Mumbai Fire Engineering – What Future ?

Previous Posts in This Series …

2011-10-25:  NIST’s Recommendations on the 9-11 WTC Building Collapses … GROUP 1. Increased Structural Integrity – Recommendations 1, 2 & 3 (out of 30)

2011-11-18:  NIST WTC Recommendations 4-7 > Structural Fire EnduranceGROUP 2.  Enhanced Fire Endurance of Structures – Recommendations 4, 5, 6 & 7

2011-11-24:  NIST WTC Recommendations 8-11 > New Design of StructuresGROUP 3.  New Methods for Fire Resisting Design of Structures – Recommendations 8, 9, 10 & 11

2011-11-25:  NIST WTC Recommendations 12-15 > Improved Active ProtectionGROUP 4.  Improved Active Fire Protection – Recommendations 12, 13, 14 & 15

2011-11-30:  NIST Recommendations 16-20 > Improved People EvacuationGROUP 5.  Improved Building Evacuation – Recommendations 16, 17, 18, 19 & 20

2011-12-04:  NIST WTC Recommendations 21-24 > Improved FirefightingGROUP 6.  Improved Emergency Response – Recommendations 21, 22, 23 & 24

2011-12-07:  NIST WTC Recommendations 25-28 > Improved PracticesGROUP 7.  Improved Procedures and Practices – Recommendations 25, 26, 27 & 28

2011-12-08:  NIST WTC Recommendations 29-30 > Improved Fire EducationGROUP 8.  Education and Training – Recommendations 29 & 30 (out of 30)

.

Colour image showing 'The Cloud' Residential Tower Project, in Seoul (South Korea) ... which will be completed in 2015. Design by MVRDV Architects, The Netherlands. Click to enlarge.
Colour image showing 'The Cloud' Residential Tower Project, in Seoul (South Korea) ... which will be completed in 2015. Design by MVRDV Architects, The Netherlands. Click to enlarge.

.

2011-12-15:  You know what is coming soon … so Merry Christmas & Happy New Year to One and All !!

.

  1.     There were 2 Important Reasons for undertaking this Series of Posts …

(a)       The General Public, and particularly Client Organizations, should be facilitated in directly accessing the core content of the 2005 NIST WTC Recommendations.  Up to now, many people have found this to be a daunting task.  More importantly, I also wanted to clearly show that implementation of the Recommendations is still proceeding far too slowly … and that today, many significant aspects of these Recommendations remain unimplemented.  Furthermore, in the case of some recent key national standards, e.g. British Standard BS 9999, which was published in 2008 … the NIST Recommendations were entirely ignored.

As a golden rule … National Building Codes/Regulations and National Standards … cannot, should not, and must not … be applied without informed thought and many questions, on the part of a building designer !

(b)       With the benefit of hindsight, and our practical experience in FireOx International … I also wanted to add a necessary 2011 Technical Commentary to the NIST Recommendations … highlighting some of the radical implications, and some of the limitations, of these Recommendations … in the hope of initiating a much-needed and long overdue international discussion on the subject.

Colour photograph showing the Taipei 101 Tower, in Taiwan ... which was completed in 2004. Designed by C.Y. Lee & Partners Architects/Planners, Taiwan. Click to enlarge.
Colour photograph showing the Taipei 101 Tower, in Taiwan ... which was completed in 2004. Designed by C.Y. Lee & Partners Architects/Planners, Taiwan. Click to enlarge.

” Architecture is the language of a culture.”

” A living building is the information space where life can be found.  Life exists within the space.  The information of space is then the information of life.  Space is the body of the building.  The building is therefore the space, the information, and the life.”

C.Y. Lee & Partners Architects/Planners, Taiwan

[ This is a local dialect of familiar Architectural Language.  However, the new multi-aspect language of Sustainable Design is fast evolving.  In order to perform as an effective and creative member of a Trans-Disciplinary Design & Construction Team … can Fire Engineers quickly learn to communicate on these wavelengths ??   Evidence to date suggests not ! ]

.

  2.     ‘Climate Change’ & ‘Energy Stability’ – Relentless Driving Forces for Sustainable Design !

Not only is Sustainable Fire Engineering inevitable … it must be !   And not at some distant point in the future … but now … yesterday !!   There is such a build-up of pressure on Spatial Planners and Building Designers to respond quickly, creatively, intuitively and appropriately to the relentless driving forces of Climate Change (including climate change mitigation, adaptation, and severe weather resilience) and Energy Stability (including energy efficiency and conservation) … that there is no other option for the International Fire Science and Engineering Community but to adapt.  Adapt and evolve … or become irrelevant !!

And one more interesting thought to digest … ‘Green’ is not the answer.  ‘Green’ looks at only one aspect of Sustainable Human & Social Development … the Environment.  This is a blinkered, short-sighted, simplistic and ill-conceived approach to realizing the complex goal of a Safe and Sustainable Built Environment.  ‘Green’ is ‘Sustainability’ for innocent children !!

Colour image showing the Shanghai Tower Project, in China ... which will be completed in 2014. Design by Gensler Architects & Planners, USA. Click to enlarge.
Colour image showing the Shanghai Tower Project, in China ... which will be completed in 2014. Design by Gensler Architects & Planners, USA. Click to enlarge.

.

  (a)      Organization for Economic Co-Operation & Development (OECD) – 2012’s Environmental Outlook to 2050

Extract from Pre-Release Climate Change Chapter, November 2011 …

Climate change presents a global systemic risk to society.  It threatens the basic elements of life for all people: access to water, food production, health, use of land, and physical and natural capital.  Inadequate attention to climate change could have significant social consequences for human wellbeing, hamper economic growth and heighten the risk of abrupt and large-scale changes to our climatic and ecological systems.  The significant economic damage could equate to a permanent loss in average per capita world consumption of more than 14% (Stern, 2006).  Some poor countries would be likely to suffer particularly severely.  This chapter demonstrates how avoiding these economic, social and environmental costs will require effective policies to shift economies onto low-carbon and climate-resilient growth paths.’

  (b)      U.N. World Meteorological Organization (WMO) Greenhouse Gas Bulletin No.7, November 2011

Executive Summary …

The latest analysis of observations from the WMO Global Atmosphere Watch (GAW) Programme shows that the globally averaged mixing ratios of Carbon Dioxide (CO2), Methane (CH4) and Nitrous Oxide (N2O) reached new highs in 2010, with CO2 at 389.0 parts per million (ppm), CH4 at 1808 parts per billion (ppb) and N2O at 323.2 ppb.  These values are greater than those in pre-industrial times (before 1750) by 39%, 158% and 20%, respectively.  Atmospheric increases of CO2 and N2O from 2009 to 2010 are consistent with recent years, but they are higher than both those observed from 2008 to 2009 and those averaged over the past 10 years.  Atmospheric CH4 continues to increase, consistent with the past three years.  The U.S. National Oceanic & Atmospheric Administration (NOAA) Annual Greenhouse Gas Index shows that from 1990 to 2010 radiative forcing by long-lived Greenhouse Gases (GHG’s) increased by 29%, with CO2 accounting for nearly 80% of this increase.  Radiative forcing of N2O exceeded that of CFC-12, making N2O the third most important long-lived Greenhouse Gas.

  (c)      International Energy Agency (IEA) – World Energy Outlook, November 2011

Extract from Executive Summary …

There are few signs that the urgently needed change in direction in global energy trends is underway.  Although the recovery in the world economy since 2009 has been uneven, and future economic prospects remain uncertain, global primary energy demand rebounded by a remarkable 5% in 2010, pushing CO2 emissions to a new high.  Subsidies that encourage wasteful consumption of fossil fuels jumped to over $400 billion.  The number of people without access to electricity remained unacceptably high at 1.3 Billion, around 20% of the world’s population.  Despite the priority in many countries to increase energy efficiency, global energy intensity worsened for the second straight year.  Against this unpromising background, events such as those at the Fukushima Daiichi Nuclear Power Plant and the turmoil in parts of the Middle East and North Africa (MENA) have cast doubts on the reliability of energy supply, while concerns about sovereign financial integrity have shifted the focus of government attention away from energy policy and limited their means of policy intervention, boding ill for agreed global climate change objectives.’

Colour image showing the One World Trade Center Project, in New York City (USA) ... which will be completed in 2013. Design by Skidmore Owings & Merrill, Architects/Planners, USA. Click to enlarge.
Colour image showing the One World Trade Center Project, in New York City (USA) ... which will be completed in 2013. Design by Skidmore Owings & Merrill, Architects/Planners, USA. Click to enlarge.

[ Not just in the case of Tall, Super-Tall and Mega-Tall Buildings … but the many, many Other Building Types in the Built Environment … are Building Designers implementing the 2005 & 2008 NIST WTC Recommendations … without waiting for Building and Fire Codes/Regulations and Standards to be properly revised and updated ??   Evidence to date suggests not ! ]

.

  3.     Separate Dilemmas for Client Organizations and Building Designers …

As discussed earlier in this Series … the Fire Safety Objectives of Building and Fire Codes/Regulations are limited to:

  • The protection of building users/occupants ;   and
  • The protection of property … BUT only insofar as that is relevant to the protection of the users/occupants ;

… because the function of Building and Fire Codes is to protect Society.  Well, that is supposed to be true !   Unfortunately, not all Codes/Regulations are adequate or up-to-date … as we have been observing here in these posts.

.

Just taking the Taipei 101 Tower as an example, I have very recently sent out three genuine, bona fide e-mail messages from our practice …

2011-12-08

Toshiba Elevator & Building Systems Corporation (TELC), Japan.

To Whom It May Concern …

Knowing that your organization was involved in the Taipei 101 Project … we have been examining your WebSite very carefully.  However, some important information was missing from there.

For our International Work … we would like to receive technical information on the Use of Elevators for Fire Evacuation in Buildings … which we understand is actually happening in the Taipei Tower, since it was completed in 2004.

The Universal Design approach must also be integrated into any New Elevators.

Can you help us ?

C.J. Walsh

[2012-01-10 … No reply yet !]

.

2011-12-12

Mr. Thomas Z. Scarangello P.E. – Chairman & CEO, Thornton Tomasetti Structural Engineers, New York.

Dear Thomas,

Knowing that your organization was involved in the structural design of the Taipei 101 Tower, which was completed in 2004 … and in the on-going design of many other iconic tall, super-tall and mega-tall buildings around the world … we have been examining your Company Brochures and WebSite very carefully.  However, some essential information is missing.

As you are certainly aware … implementation of the 2005 & 2008 National Institute of Standards & Technology (NIST) Recommendations on the Collapse of WTC Buildings 1, 2 & 7, in New York, on 11 September 2001 … is still proceeding at a snail’s pace, i.e. very slowly.  Today, many significant aspects of NIST’s Recommendations remain unimplemented.

For our International Work … we would like to understand how you have responded directly to the NIST Recommendations … and incorporated the necessary additional modifications into your current structural fire engineering designs.

Many thanks for your kind attention.  In anticipation of your prompt and detailed response …

C.J. Walsh

[2012-01-10 … No reply yet !]

.

2011-12-14

Mr. C.Y. Lee & Mr. C.P. Wang, Principal Architects – C.Y. Lee & Partners Architects/Planners, Taiwan.

Dear Sirs,

Knowing that your architectural practice designed the Taipei 101 Tower, which was completed in 2004 … and, later, was also involved in the design of other tall and super-tall buildings in Taiwan and China … we have been examining your Company WebSite very carefully.  However, some essential information is missing.

As you are probably aware … implementation of the 2005 & 2008 U.S. National Institute of Standards & Technology (NIST) Recommendations on the Collapse of WTC Buildings 1, 2 & 7, in New York City, on 11 September 2001 … is still proceeding at a snail’s pace, i.e. very slowly.  Today, many significant aspects of NIST’s Recommendations remain unimplemented.

For our International Work … we would like to understand how you have responded directly to the NIST Recommendations … and incorporated the necessary additional modifications into your current architectural designs.

Many thanks for your kind attention.  In anticipation of your prompt and detailed response …

C.J. Walsh

[2012-01-10 … No reply yet !]

.

So … how many Clients, or Client Organizations, are aware that to properly protect their interests … even, a significant part of their interests … it is vitally necessary that Project-Specific Fire Engineering Design Objectives be developed which will have a much wider scope ?   The answer is … not many !

How many Architects, Structural Engineers, and Fire Engineers fully explain this to their Clients or Client Organizations ?

And how many Clients/Client Organizations either know that they should ask, or have the balls to ask … their Architect, Structural Engineer and Fire Engineer for this explanation … and furthermore, in the case of any High-Rise Building, Iconic Building, or Building having an Important Function or an Innovative Design … ask the same individuals for some solid reassurance that they have responded directly to the 2005 & 2008 NIST WTC Recommendations … and incorporated the necessary additional modifications into your current designs … whatever current Building and Fire Codes/Regulations do or do not say ??   A big dilemma !

.

A common and very risky dilemma for Building Designers, however, arises in the situation where the Project Developer, i.e. the Client/Client Organization … is the same as the Construction Organization.  The Project Design & Construction Team – as a whole – now has very little power or authority if a conflict arises over technical aspects of the design … or over construction costs.  An even bigger dilemma !!

Colour image showing the Kingdom Tower Project, in Jeddah (Saudi Arabia) ... which will be completed in 2018. Design by Adrian Smith & Gordon Gill Architecture, USA. Click to enlarge.
Colour image showing the Kingdom Tower Project, in Jeddah (Saudi Arabia) ... which will be completed in 2018. Design by Adrian Smith & Gordon Gill Architecture, USA. Click to enlarge.

.

  4.     The Next Series of Posts – 2008 NIST WTC Recommendations

In the new year of 2012 … I will examine the later NIST Recommendations which were a response to the Fire-Induced Progressive Collapse of World Trade Center Building No.7.

Colour image showing the Signature Tower Project, in Jakarta (Indonesia) ... which will be completed in 2016. Design by Smallwood Reynolds Stewart Stewart Architects & Planners, USA. Click to enlarge.
Colour image showing the Signature Tower Project, in Jakarta (Indonesia) ... which will be completed in 2016. Design by Smallwood Reynolds Stewart Stewart Architects & Planners, USA. Click to enlarge.

.

  5.     Please … Your Comments, Views & Opinions ?!?

The future of  Conventional Fire Engineering ended on the morning of Tuesday, 11 September 2001, in New York City … an engineering discipline constrained by a long heritage deeply embedded in, and manacled to, an outdated and inflexible prescriptive approach to Codes/Regulations and Standards … an approach which is irrational, ignores the ‘real’ needs of the ‘real’ people who use and/or occupy ‘real’ buildings … and, quite frankly, no longer makes any scientific sense !!

On the other hand … having confronted the harsh realities of 9/11 and the Mumbai ‘Hive’ Attacks, and digested the 2005 & 2008 NIST WTC RecommendationsSustainable Fire Engineering … having a robust empirical basis, being ‘person-centred’, and positively promoting creativity … offers the International Fire Science and Engineering Community a confident journey forward into the future … on many diverse routes !

This IS the only appropriate response to the exciting architectural innovations and fire safety challenges of today’s Built Environment.

BUT … what do you think ?

.

.