Technical Control of Construction

Residential Fire Suppression System – Low Pressure Water Mist

2016-06-13:  Further to the Urgent Fire Safety Recommendations in Modern High-Performance Housing (posted on 2016-04-11) … this is what a Residential Fire Suppression System would look like in a Notional Detached House, and what it would cost …

Colour image showing the ground floor view of a Notional 2 Storey / 4 Bedroom Detached House. The pressurized 300 litre water cylinder is stored in the Garage.
Colour image showing the ground floor view of a Notional 2 Storey / 4 Bedroom Detached House. The pressurized 300 litre water cylinder is stored in the Garage. Click to enlarge.

Detached House – Ground Floor Plan – Ceiling Head/Nozzle Layout (PDF File, 97 Kb)

Detached House – Upstairs Plan – Ceiling Head/Nozzle Layout (PDF File, 13 Kb)

Pipework Installation
Water Mist Pipework Installation. Click to enlarge.
Mist Ceiling Head/Nozzle
Water Mist Ceiling Head/Nozzle. Click to enlarge.

.

Low Pressure Water Mist Fire Suppression System

Water flow rate = 13.94 litres per nozzle per minute.  Pressurized 300 Litre Water Cylinder, with BurnStop environment-friendly additive, supplies water to the low flow rate, CPVC (Chlorinated Polyvinyl Chloride) pipe network serving 25 Mist Ceiling Heads/Nozzles fixed at pre-determined locations.  See Plans.  Water runtime is 10 minutes, between 2 heads operating simultaneously without any mains water backup.  Installation takes 3 days in total (2 days first fix, plus 1 day second fix and commissioning).

The mains water supply system in Ireland is not reliable.

A water mist system or a sprinkler system ?

Cost for the above Notional Water Mist Installation is €7,340.00 (Euros) / £5,676.00 (British Pounds) – plus VAT.  This price is on the basis as a one-off installation in Ireland.  If a number of properties require installation at the same time, then travel costs are dispersed and the individual price per property is significantly reduced.

In a Terrace of Houses, where there is a Timber-Framed Party Wall between each house ... a Residential Fire Suppression System MUST be installed in ALL houses to be effective in each single property.
In a Terrace of Houses, where there is a Timber-Framed Party Wall between each house … a Residential Fire Suppression System MUST be installed in ALL houses to be effective in each single property.

.

END

U.S. Implementation of NIST’s 9-11 WTC Recommendations ?!?!

2016-05-05:  A Mickey Mouse Effort would be a polite way of describing the long drawn-out and tortuous process of implementing NIST’s Recommendations in the United States.  A better description might be … FUBAR !

15 Years After the 2001 WTC 9-11 Attacks in New York City … absolutely nothing has been done concerning the implementation of a significant number of Recommendations … other Recommendations have been only partially implemented, with many being limited to application in buildings over 128m high (420 feet in ye olde silly imperial units of measure), or else buildings over 22.86m high (75 feet) which have an occupant load exceeding 5,000 people or are essential facilities, e.g. hospitals.  And believe it or not, some implementing measures are still being challenged and they may yet be reversed in the years ahead.  Forget about discussing the already narrow Fire Safety Objectives in building codes/regulations, or Protecting Society, etc., etc.  In essence, it has all come down to that ‘durty’ four letter word: COST !

But read this 2011 Status Report for yourselves.  I have kept in touch with the current situation over there.

NIST’s WTC 9-11 Recommendations Status Report (2011-08-08) – PDF File, 330 Kb

Why should this matter ?

In 2005 & 2008, the U.S. National Institute of Standards & Technology issued a series of very important [ critical ] Recommendations on badly needed revisions to the Design – Construction – Management – Firefighting Procedures for Very High/Tall Buildings, High-Risk Buildings, Iconic Buildings, and Innovatively Designed Buildings.  Many, if not all, of these Recommendations were, and remain, just as valid and just as necessary in the case of other building types … whatever their height.

A lot of effort was expended here, a few years ago, on a detailed examination of the NIST Recommendations.  In one respect, the Recommendations have become dated and obsolete.  The recent 2016 Brussels and 2015 Paris Hive Attacks have altered how we must categorize and deal with buildings of ‘high-risk’.  From the start, however, the disability-related Recommendations only concerned mobility impaired building occupants … a serious flaw.

NIST does not have the legal authority to implement its own Recommendations within the United States.  However, implementation by the Model Code (e.g. IBC & NFPA) Organizations has been brutally slow and entirely inadequate.

And … it is very noticeable how so many other countries around the world are continuing  to completely ignore NIST’s Recommendations.  9-11 never happened !

.

.

END

GB Climate Change’s Green Deal – National Audit Office Report !

2016-04-23:  Yesterday … Earth Day … and also the Official Signing Ceremony for the 2015 Paris Climate Change Agreement at United Nations Headquarters, in New York City …

UN Official Signing Ceremony for the 2015 Paris Climate Change Agreement
Click image to enlarge.

On the day before that, 21 April, in a Press Release issued by the World Meteorological Organization (WMO)

A prolonged run of record global temperatures and extreme weather, the rapid melting of Arctic ice, and widespread bleaching of ocean coral reefs underline the urgent need to sign and implement the Paris Agreement on Climate Change, according to the World Meteorological Organization (WMO).

WMO Secretary-General Petteri Taalas said that 2016 has so far overshadowed even the record-breaking year of 2015.

“The magnitude of the changes has been a surprise even for veteran climate scientists. The state of the planet is changing before our eyes,” said Mr Taalas.

.

A little earlier in April 2016 … and within the above international context came this problematic, but not-entirely-unexpected tale from Great Britain … the tip of a foul-smelling iceberg in quite a few countries …

Green Deal & Energy Company Obligation

“Improving household energy efficiency is central to government achieving its aims of providing taxpayers with secure, affordable and sustainable energy.  The Department of Energy and Climate Change’s ambitious aim to encourage households to pay for measures looked good on paper, as it would have reduced the financial burden of improvements on all energy consumers.  But in practice, its Green Deal design not only failed to deliver any meaningful benefit, it increased suppliers’ costs – and therefore energy bills – in meeting their obligations through the Energy Company Obligation (ECO) Scheme.  The Department now needs to be more realistic about consumers’ and suppliers’ motivations when designing schemes in future to ensure it achieves its aims.”

Amyas Morse, Head of the British National Audit Office (NAO), 14 April 2016.

[ And as you read further down … consider how important it must be for future effective climate change policy implementation in all of our countries, particularly those countries with an ‘historical responsibility’ …

  • that accurate, precise and reliable climate change data and statistics be gathered together and properly managed … and this means, for example, that at European Union Member State level, the national statistics organization must be in control of the process … and at EU level, Eurostat must be in control ;
  • that implementation be stringently and independently monitored for long-term effectiveness ;
  • that economists be removed from core decision-making in this area … and the veto they currently exercise over necessary mitigation and adaptation actions be removed. ]

The National Audit Office has today concluded that the Department of Energy and Climate Change’s (DECC) Green Deal has not achieved value for money.  The scheme, which cost taxpayers £240 Million including grants to stimulate demand, has not generated additional energy savings.  This is because DECC’s design and implementation did not persuade householders that energy efficiency measures are worth paying for.

The NAO Report: Green Deal and Energy Company Obligation also found that DECC’s design of its Energy Company Obligation (ECO) scheme to support the Green Deal added to energy suppliers’ costs of meeting their obligations.  This reduced the value for money of ECO, but the Department’s information is not detailed enough to conclude by how much suppliers have met their obligations for saving carbon dioxide (CO2) and reducing bills.

The report finds that while the Department achieved its target to improve 1 Million Homes with the schemes, this is not a direct indicator of progress against the objective of reducing carbon dioxide (CO2) emissions.  This is because different types of energy-efficiency measures save different amounts of CO2.

The schemes have saved substantially less CO2 than previous supplier obligations, mainly because of the Department’s initial focus on ‘harder-to-treat’ homes, as its analysis showed that previous schemes had absorbed demand for cheaper measures.  The Department expects the measures installed through ECO up to 31 December 2015 to generate 24 Mega Tonnes of carbon dioxide (Mt CO2) savings over their lifetime, only around 30% of what the predecessor schemes achieved over similar timescales.

Demand for Green Deal finance has fallen well below the government’s expectations, with households only funding 1% of the measures installed through the schemes with a Green Deal loan.  The schemes have not improved as many solid-walled homes, a key type of ‘harder-to-treat’ homes, as the Department initially planned.  As part of changes to ECO in 2014, the Department enabled suppliers to achieve their obligations with cheaper measures, moving away from its focus on harder-to-treat properties.  ECO has generated £6.2 Billion of notional lifetime bill savings to 31 December 2015 in homes most likely to be occupied by fuel poor people.  Beyond this, the Department cannot measure the impact of the schemes on fuel poverty.

There are significant gaps in the Department’s information on costs, which means it is unable to measure progress towards two of its objectives: to increase the efficiency with which suppliers improve the energy efficiency of ‘harder-to-treat’ houses, and to stimulate private investment.  The lack of consistency in the government’s approach during the schemes could increase the long-term costs of improving household energy efficiency.

In the NAO’s accompanying investigation into DECC’s loans to the Green Deal Finance Company, also published today, it found that the Department expects that it will not recover its £25 Million stakeholder loan to the finance company, plus £6 Million of interest that has accrued on it.  The Department based its stakeholder loan on forecasts of significant consumer demand for Green Deal loans.  But demand for Green Deal finance was lower than the Department forecast from the outset, meaning the finance company could not cover its operating costs.  The Department agreed a second loan worth up to £34 Million in October 2014, of which the finance company has drawn down £23.5 Million.  The Department still expects to recover this loan in full as it will be repaid before other investors in the finance company.

.

Is it any wonder that the ‘real’ Greenhouse Gas (GHG) Numbers continue to climb relentlessly ?!?

.

.

END

LEED, PassivHaus & BREEAM Housing ~ Atrocious Fire Safety !!

2016-04-11:  It Happened One Night !

And Maybe … if it hadn’t been that particular night, during all the festivities of New Year’s Eve 2015, we would never have heard about the Address Supertall Hotel Fire, in Dubayy (UAE).  A long search on the Internet afterwards led to the detailed, post fire analysis report on the 2014 Lacrosse Docklands Fire, in Melbourne (Australia) … followed by some more searching, and a very large can of worms opened up … similar nasty façade (external fabric) fires in many, many countries … involving large chunks of flaming debris falling from terrific heights, carried by the wind to a significant distance away from the building of fire origin.

Click to enlarge.
Click to enlarge.

Some people have tried to suggest that the only reason for these fires is inadequate building codes/regulations.  No … the reason for these fires is much more than that … it’s the ‘SYSTEM’ !   In other words, how the International Construction Sector is organized and goes about its ordinary, everyday activities and tasks.  We must also talk about poor quality design and construction … and a lack of stringent, independent enforcement of effective building codes/regulations and standards.  I have written this down many times before … Self-Regulation is NO Regulation !!

It is very clear that Conventional Fire Engineering … as currently practiced, internationally … is no longer ‘fit for purpose’.  For discussion at SFE 2016 DUBLIN.  Check out the Fire Conference Website: www.sfe-fire.eu … and on Twitter: @sfe2016dublin

.

IN IRELAND … A 2015 TERRACED HOUSING FIRE …

The general public was shocked and stunned, to put it mildly, by a very rapid and extensive 2015 Terraced Housing Fire on the outskirts of Dublin …

Click to enlarge.
Click to enlarge.

[ See my Blog, dated 2011-04-06 … about a different, but related, 2011 Terraced Housing Fire in Terenure, a suburb of Dublin City.]

Click to enlarge.
Click to enlarge.

[ Fast forward from 2011 … overtaking Priory Hall (see my series of Blogs) … to Longboat Quay, a large residential development on the south bank of the River Liffey, which flows through the middle of Dublin.  A recent visual/surface inspection of one of the units there revealed not just a poor quality of construction … but a lack of care and attention, with a mixture of incompetence and ignorance thrown in for good measure.]

Click to enlarge.
Click to enlarge.

The 2015 Terraced Housing Fire, shown above, should not have been a surprise to the ‘System’ in Ireland.  Research carried out in the U.S.A., Belgium and The Netherlands since 2012, and a serious PassivHaus Apartment Fire in Köln, Germany, on the night of 5 February 2013  … have all shown that the modern home (highly insulated, airtight, packed with electronic equipment and wiring, and fast-burning synthetic furnishings, etc.) is the ‘perfect storm’ of fire conditions and outcomes.  More open residential design + increased fuel loads + new construction systems and materials = faster development of fires, much reduced times to flashover, far less time for occupant evacuation, particularly people with activity limitations … and shorter building collapse times.

The time to flashover in modern high-performance housing, i.e. Sustainable/Green/PassivHaus/Eco/LEED/Bio/+Energy/Low Carbon/BREEAM/Zero Carbon/SMART … can be 7 times faster than in conventional/legacy housing … or less than 5 minutes, compared with just over 29 minutes !

All of this research can be found on the Links & Docs Page of the SFE 2016 DUBLIN Website.

Let us be crystal clear … there is nothing Sustainable/Green/PassivHaus/Eco/LEED/Bio/+Energy/Low Carbon/BREEAM/Zero Carbon/SMART about the post-fire scenes of destruction shown above.  And only for the physical separation between terraces, which can be clearly seen in the last photograph … the fire would have kept spreading.

.

URGENT FIRE SAFETY RECOMMENDATIONS …

Without a balanced, proper approach to the issue of Fire Safety in this type of modern, high-performance housing … occupant safety is seriously threatened.  And if, in the event of a fire incident, the occupants are asleep … or people with activity limitations are living in the house … that threat will be extremely grave indeed.

Reality – Reliability – Redundancy – Resilience !

So … what needs to change ?   In Ireland, our immediate problem is Timber-Framed Housing (as shown above) … and the following is an outline of what must change … NOW !

  1. Party Walls, i.e. the walls separating one house from another, must be constructed of solid masonry, with a uniform and uncompromised thickness of at least 200mm … plastered on both sides, not dry-lined, for adequate smoke resistance … and be continued above the roof covering for at least 300mm.
  2. An effective Fire Detection System must be installed.  The conventional ‘package’ of one smoke detector per floor in the hallway and staircase of a standard 2 storey semi-detached house is nowhere near being adequate.
  3. An effective Residential / Domestic Fire Suppression System must be installed, e.g. low pressure water mist.  See later post, dated 2016-06-13, for a costed notional installation.
  4. If there is a Controlled Ventilation System, either mechanical or natural, in the house (for the purposes of air quality, heat exchange and energy conservation), it must be linked to the fire detection system.  In the event of a fire incident, the Ventilation System must immediately cease operation, and remain ‘fully open’.  This is in order to mitigate the build-up of high positive pressure, within a confined airtight space, caused by a developing fire … and to provide an exhaust route for smoke and toxic gases … during the short period of time prior to activation of the fire suppression system.
  5. Intermediate Timber Floors and Evacuation Routes, including fire resisting doorsets, must be reliably protected from fire and smoke.  The minimum period of fire and smoke resistance must be linked to local fire service support infrastructure.  In other words, the local fire services must be allowed sufficient time to arrive at the scene of a fire in strength … to search for any occupants still remaining in the fire building … and to bring the fire under control.
  6. Uppermost Ceilings under a trussed timber roof structure, including any trap doorsets into the roof space, must be similarly and reliably protected from fire and smoke.  Once fire enters a roof space, the light trussed timber structure will collapse within a few minutes.
  7. Front and Back Entrance/Egress Doors must be outward opening.  In the 2013 German PassivHaus Apartment Fire, the occupant found it extremely difficult to open inward opening doors and windows because of the high positive pressure caused by the developing fire.  This unusual phenomenon was confirmed in the 2015 Finnish Apartment Fire Tests, when much higher positive pressures were observed.
  8. Internal Linings of External Walls must comprise 2 layers of plasterboard, with all joints staggered … steel fixed, at not more than 150mm centres.  Once fire breaches the internal lining of an external wall, the whole building will become involved in the fire.  Horizontal and vertical fire sealing behind these linings, even if properly installed (!), are too little and too late.
  9. Frontline Firefighters must be supported by specialist structural engineering and hazard appraisal units … and light/portable/reliable Thermal Imaging Cameras must be recognized as a standard tool of firefighting.

.

SUSTAINABLE HOUSING & RESIDENTIAL BUILDINGS …

These building types are more popularly known as Green, PassivHaus / Passive House, LEED, Eco, Bio, BREEAM, +Energy, Zero / Low / Nearly Zero Carbon, or SMART, etc., etc, etc.   In ALL of these cases, however, an Effective Residential Fire Suppression System MUST BE INSTALLED, e.g. low pressure water mist !

In everyday practice … Authorities Having Jurisdiction (AHJ’s), and the Organizations and Individuals responsible for the far-too-rapid construction of these innovative building types are either completely and blissfully ignorant, or callously and negligently in denial, about the seriously negative impacts on Occupant & Firefighter Fire Safety and Building Fire Protection.

BUT … slowly … more and more reliable evidence is being gathered !   Please visit the Links & Docs Page on: www.sfe-fire.eu … and also view this Presentation on some very interesting 2015 Apartment Fire Tests in Finland: www.youtube.com/watch?v=0Ss_ONolzLY

.

ENERGY CONSERVATION & EFFICIENCY UPGRADING OF EXISTING BUILDINGS …

In refurbishment projects where insulation is fixed to the internal surfaces of external walls … similar fire safety problems exist, and they must be solved by reviewing the full checklist above.  Refer again to the PassivHaus Apartment Fire in Köln, Germany, on the night of 5 February 2013 … and to the 2015 Apartment Fire Tests in Finland

.

.

END

SFE 2016 DUBLIN – A Benchmark Fire Engineering Event !

2015-11-06 !   We are very pleased to announce that the Fire Safe Europe Alliancewww.firesafeeurope.eu … has become actively involved, together with Glasgow Caledonian University and FireOx International, in co-hosting SFE 2016 DUBLIN.  To facilitate the Network’s full engagement and provide sufficient time for promotion, etc … it was jointly agreed that the new dates for this Event shall be from 28-30 September 2016.

We have every confidence that SFE 2016 DUBLIN will now be a much better event … having a wider range of stakeholder participation.

.

2015-06-29 …

Sustainable Fire Engineering – Effective Fire Safety for All in Sustainable Buildings !
28-30 September 2016      Dublin, Ireland
————
www.sustainable-firengineering.ie  or  www.sfe-fire.eu
———
Approved Regional Sustainable Built Environment Conference in the 2016-17 Series
——
The Gresham Hotel, O’Connell Street, Dublin, Ireland

Céad Míle Fáilte (Hundred Thousand Welcomes) to Dublin, in Ireland … and to the First International Conference devoted to this complex subject !

The 21st Century has had a cruel and savage birth: extreme man-made events, hybrid disasters, severe natural events, complex humanitarian emergencies, with accelerating climate change and variability.  The old certainties are crumbling before our eyes …

The resolute Answer to these threats and the rapidly changing social and environmental needs of our world is Sustainable Fire Engineering !

•  SFE fulfils a critical role in the realization of a Safe, Resilient & Sustainable Built Environment for All ;
•  SFE facilitates positive progress towards the United Nation’s 17 Sustainable Development Goals & 169 Performance Targets, which were adopted in September 2015 ;
•  SFE fast-tracks proper compliance with the Basic Requirements for Construction Works in the European Union’s Construction Products Regulation 305/2011 (Annex I), specifically the interlinked Requirements 7, 2, 1, 3 & 4.

Please join us in an informal, multidisciplinary and pre-normative forum … as we examine Sustainable Fire Engineering more deeply.Event Logo for SFE 2016 DUBLIN

INTRODUCTION to SFE 2016 DUBLIN

Fire Losses – both direct and indirect – amount to a very significant percentage of GDP in all economies, whether they are rich or poor … and result in enormous environmental damage and social disruption.  Fire Engineering, including Fire Prevention and Protection in Buildings, is a major multi-billion Euro/Dollar component of the Construction Industrial Sector – worldwide.

Unfortunately … a fundamental conflict exists between Sustainable Building Design Strategies and the fire safety responses adopted in today’s Conventional Fire Engineering.  To take a simple example: for cooling, heating or ventilation purposes in a Sustainable Building, it is necessary to take advantage of natural unobstructed patterns of air movement in that building.  On the other hand, fire engineers in private practice and control personnel in Authorities Having Jurisdiction (AHJ’s) will demand that building spaces be tightly compartmented in order to limit the spread of fire and smoke … dramatically interfering with those natural patterns of air movement.

Unusual fire behaviour and a range of difficult fire safety issues (critical, in the case of firefighters) also arise from the Innovative Design Features (for example, ‘green’ roofs, elaborate intelligent façades) and Building Products / Systems (for example, photovoltaic panels) being installed in Sustainable Buildings.

A wide chasm separates the language and understanding of these two very different design disciplines.  As a result, the performance of Sustainable Buildings can be seriously compromised.  If, on the other hand, adequate independent technical control is absent on site … it is fire safety which is weakened.

And because, in most countries, the emphasis is placed on pre-construction design intent rather than the ‘real’ performance of the completed/occupied building … these problems are ignored and remain hidden … until a serious fire breaks out !

SUSTAINABLE FIRE ENGINEERING’s AIM

The Aim of Sustainable Fire Engineering is to dramatically reduce all direct and indirect fire losses in the Human Environment (including social, built, economic, environmental, virtual, and institutional) … and to protect the Natural Environment.

Towards Zero Preventable Fires in the Built Environment !

In essence … Sustainable Fire Engineering heavily front-loads Fire Prevention and Fire Protection Measures … above and beyond the minimal and very limited fire safety objectives mandated by current legislation.

SFE’s Key Concepts are … RealityReliabilityRedundancyResilience !

SFE Design Solutions are …

  • Adapted to local geography, climate change and variability, social need, economy, and culture ;
  • Reliability-based ;
  • Person-centred ;
  • Resilient.

SFE 2016 DUBLIN OBJECTIVES

1.  To initiate discussion and foster mutual understanding between the International Sustainable Development / Climate Change / Urban Resilience Communities and the International Fire Science & Engineering Community.
2.  To bring together today’s disparate Sectors within the International Fire Science and Engineering Community … to encourage better communication between each and trans-disciplinary collaboration between all.
3.  To transform Conventional Fire Engineering into an ethical and fully professional Sustainable Design Discipline which is fit for purpose in the 21st Century … meaning … that fire engineers can participate actively in a sustainable design process, and can respond creatively with sustainable fire engineering design solutions which result in Effective Fire Safety for All in Sustainable Buildings.
4.  To launch a CIB W14 Research Working Group VI Reflection Document: ‘Sustainable Fire Engineering Design & Construction’ … which will establish a framework for discussion on the future development of Sustainable Fire Engineering.

SFE 2016 DUBLIN WEBSITE

Today !   Visit the SFE 2016 DUBLIN Website at … www.sustainable-firengineering.ie  or  www.sfe-fire.eu

Download the Information on the Links Page … Review the wide range of Topics which will be examined and discussed at SFE 2016 DUBLIN … Submit an Abstract for a Paper … and Give serious consideration to becoming an Industry Exhibitor, or an Enlightened, Far-sighted Sponsor !!

.

.

END

‘Fire Safety for All’: Open Call for Innovative Products & Systems

2015-02-02:  This is NOT … I repeat NOT … a small niche market in the Global Multi-Billion Euro Fire Safety & Protection Related Construction Industrial Sector !   This IS the whole nine yards !!

This is an Open Call for Innovative, Well-Designed Fire Safety / Protection and Accessibility Related Construction Products and Systems, Other Measures and Means, Mechanical and Electronic Devices, ETC, ETC, ETC, ETC !

This Call is particularly aimed at Manufacturers, Suppliers and Distributors in China, India, Japan, and Mainland Europe !

We want to see ‘Real’ Products and Systems, Measures and Means, Mechanical and Electronic Devices, ETC, ETC, ETC, ETC … not flashy brochures … at the 2015 Dublin ‘Fire Safety for All’ Industrial Exhibition, on 9 & 10 April !

.

An Accessible Building is Safer, Easier to Use and More Comfortable for ALL Building Users

If Fire Safety for All is properly considered at Building Design Stage :
• Buildings are easier to understand (intuitive) during a Real Fire Evacuation
Fire Evacuation Routes (obvious) are easier to find and to use
• Everyone can safely evacuate a Building on Fire – no more tragic tales about people being left behind in multi-storey schools and offices
RealityReliabilityRedundancy – are the 3 Essential Keywords

Client Organizations: A Building which is NOT Accessible is difficult, if not impossible, for everybody to evacuate during a real fire incident !

So …

Grab a Bicycle – Get a Horse – Take a Train or a Plane – Come to Dublin in April !

Fire-Safety-4-All_smlTo Exhibit / To Sponsor … please go to the Event WebSite: www.fire-safety-for-all.eu

.

.

END

Open E-Mail to ISO TC 92 (Fire Safety) – Treatment of ‘Disability’

2014-11-05:  ISO TC 92: ‘Fire Safety’ is a long-established Technical Committee within the International Standards Organization (ISO) …  www.iso.org/iso/home/standards_development/list_of_iso_technical_committees/iso_technical_committee.htm?commid=50492  … and down through the many years of its existence, since 1958, it has laboriously constructed a robust foundation which has facilitated the modern evolution of Fire Science and Engineering and the development of many standard fire safety practices and procedures around the world.

BUT …  and in spite the existence of ISO/IEC Guide 71: ‘Guidelines for Standards Developers to Address the Needs of Older Persons and Persons with Disabilities’ (a weak document which is badly in need of revision and updating !)

Recently, having examined some draft standards being processed through ISO TC 92 … I have become very tired of the blatant incompetence … and lack of care and concern merging with feigned ignorance and/or stubborn resistance, within the Technical Committee, when it comes to the issue of ‘disability’ … in other words, the major matter of the real fire safety of vulnerable building users and occupants, i.e. people with activity limitations, in real buildings.

SO …  a few days ago, I wrote the following e-mail message to a Working Group Chairperson (who shall remain nameless, because this same problem pervades the whole TC) …

.

Dear X,

With regard to All Aspects of the WG’s Work … one issue, in particular, sticks out like a sore thumb … how you treat ‘disability’.  There is no clarity here, only confusion.  There are no precise terms, only a garbled use of language and concepts.

Please allow me to suggest, with accompanying explanations, a suitable and necessary path forward.

I will circulate this e-mail message separately within ISO, and beyond.

Concerning Normative References … reference must be made to …

ISO 21542 (2011): ‘Building Construction – Accessibility & Usability of the Built Environment’

Within this document, Accessibility is understood to mean the full cycle of independent building use, in an equitable and dignified manner … and to include the approach, entry to and use of a building, egress during normal conditions and removal from the vicinity of the building … and, most importantly, evacuation during a fire incident to a ‘place of safety’ which is remote from the building.

Texts relating to ‘fire safety’ have been incorporated into the main body of this International Standard.  It is, however, just a small beginning.  Much work remains to be done.

Accessibility Design Criteria, as described in ISO 21542, must now be applied to the design and maintenance of all fire evacuation routes, fire safety related signage and fittings, etc., etc.

Use of the word escape, in any context, is strongly discouraged.

Concerning Terms & Definitions

People with Activity Limitations:  Those people, of all ages, who are unable to perform, independently and without aid, basic human activities or tasks – because of a health condition or physical/mental/cognitive/psychological impairment of a permanent or temporary nature.

Attached, please find the FireOx International ‘Fire Safety for All’ Matrix … which illustrates how the separate pieces, including ‘disability’, fit together.

Contraflow:  Emergency access by firefighters or rescue teams into a building and towards a fire, while people are still moving away from the fire and evacuating the building.

Concerning Building User/Occupant Numbers & Provision … ‘token’ is not only entirely unacceptable, it is a clear case of professional negligence …

And why, suddenly, all of these ‘musts’ ??

Cogently mandated in the United Nations Convention on the Rights of Persons with Disabilities (CRPD) … the UN CRPD’s principal aim is to ensure that the Built, Social, Economic and Virtual Environments are sufficiently ‘accessible’ to permit a vulnerable and major population group in all of our societies to enjoy the fundamental freedoms and human rights set down in the Universal Declaration of Human Rights (1948).

The language of the Convention is always very robust and very direct: ‘States Parties shall …’

Also attached, please find a United Nations Global Map showing the status of Convention Ratification back in July 2014.  At the time of writing this e-mail message, 151 Countries have ratified the UN CRPD.

Full and Effective Accessibility of the Built Environment is a human right.  Adequate provision must be made for people with disabilities to use all buildings … not just some buildings … and certainly not just limited parts of a building !

In practice, people with disabilities must be included in all practice evacuation drills … and they must be included in all activities related to ‘fire safety’ and/or necessary to prepare for safe evacuation.

Furthermore … because Electronic, Information and Communication Technologies (EICT’s) now serve a function which is critical, during a fire incident, for the safety of all building users and firefighters, property protection, minimizing environmental damage, and sustainability … they must have a user interface which is Accessible for All … from both ends.

With regard to ‘adequate’ provision … please find attached the 2010 USA Disability Statistics … which indicate:

  • Minimum Reasonable Provision for People with Disabilities in a Building … 10% of User/Occupant Population ;
  • Minimum Reasonable Provision for People with Activity Limitations in a Building … 15% of User/Occupant Population.

The numbers of people with disabilities in developing and the least developed economies far exceed numbers in developed economies !

Best wishes for the success of your meeting in Sydney.

C.J. Walsh – Consultant Architect, Fire Engineer & Technical Controller.

.

.

END

To The Barricades ! … Creative Architecture In Context !!

2014-08-28:  Earlier this month … the final straw … as I caught up on a ‘piece’ in McGraw Hill’s Architectural Record … which reproduced an original, intriguing article from designMENA.com, posted on 12 August 2014, by Nick Ames …

Rebel Architects Star In New TV Show

Qatar-based broadcaster Al Jazeera is to show a series of films focusing on radical architects from Pakistan, Brazil, Nigeria, Spain, Palestine and Vietnam.  The series – entitled ‘Rebel Architecture’ – focuses on architects using design to confront urban, environmental and social problems in their communities.

Dan Davies, producer of the series, said: “We couldn’t help noticing that despite all the problems afflicting humanity, many of which architecture uniquely has the ability to assist and even solve, most of the mainstream and architectural press celebrates the aesthetics of huge iconic projects, marvelling at insanely complicated ways to fold giant sheets of metal.”

“As we face issues from floods and natural disasters to an explosion of urban populations, soaring inequality and displacement through conflict, architecture seems wholly absent.  So we wanted to look beyond the discussion of the aesthetics of Star-chitecture and see what architects outside the mainstream are doing.”

The six-part series, which starts on 18 August, begins with a film documenting the work of Spanish architect Santiago Cirugeda, who uses his knowledge of planning law to occupy abandoned properties and to build structures on unused land.

It also features Pakistani architect Yasmeen Lari, who designs disaster relief shelters and Eyal Weizman, professor of spatial and visual cultures at Goldsmiths University, who explores the way the built environment is used as an instrument of occupation.

In Vietnam, the series follows Vo Trong Nghia, whose projects focus on open spaces and sustainable design, while in Nigeria, Kunlé Adeyemi has designed floating buildings to solve issues of flooding and overcrowding.

The final episode explores Rocinha, the largest favela in Brazil, with builder Ricardo de Oliveira, and master planner Luis Toledo.

“The rebel architects have to push boundaries, but they must also look beyond their own buildings,” said Davies.  “They start by looking at the wider context in which they live – be it Spain hit by the financial crisis, or Pakistan ravaged by floods – and work out how they can change the status quo with architecture.”

.

I SAY …

Shouldn’t every Architect be concerned about the issues raised in Nick’s article ?   And if not … why not ??

Architecture is a wide and complex field of human creative, artistic and scientific endeavour.  Yet in the international and national media, both mainstream and architectural … it does appear, as presented, to be narrowly confined to the “aesthetics of huge iconic projects”, and “insanely complicated ways to fold giant sheets of metal”.  And the various media continue to focus on and enthusiastically applaud the current, outrageous phallic skyscraper contest in, for example, the Arab Gulf Region, China and South-East Asia … a contest which is actively promoted by such international organizations as the US-based Council on Tall Buildings & Urban Habitat.  [ I might add … with entirely insufficient attention being paid to fire safety, resilience and sustainability in those Super-Tall Buildings !! ]

If Santiago Cirugeda, Yasmeen Lari, Eyal Weizman, Vo Trong Nghia, Kunlé Adeyemi, Ricardo de Oliveira, and Luis Toledo are indeed Rebels … [ I would argue that they most definitely are not ] … and each one is working in isolation … then we must urgently instigate a Revolution

Creative Architecture In Context !!

 

PRINCIPAL BARRIER …

The Institutional Framework of Today’s Conventional Architecture … typically developed to promote and protect a 19th Century Model of Architectural Practice … exerts a powerful stranglehold over the architectural profession and the schools of architecture in many countries.  It is no longer ‘fit for purpose’ in the 21st Century !

Here in Ireland … a few days before reading the Nick Ames article … I attended a long Extraordinary General Meeting of the Royal Institute of the Architects of Ireland (RIAI) … called by 10 Institute Members to demand urgent, concerted action from the Institute’s Council in response to the new and very flawed Building Control Amendment Regulations (Statutory Instruments Nos.9 & 105 of 2014), which came into effect from 1 March 2014.

Far from being an enlightening and pleasurable occasion … for many small reasons, it was annoying and frustrating.  The biggest reason of all, however, was that I saw no evidence whatever that either Council or the Membership understands the simple, fundamental truth that … self-regulation/self-certification does NOT work !

Refer back to my previous post.

The General Public in Ireland … also known as ‘The Long-Suffering Consumer’ … does not trust the Medical and Legal Professions to self-regulate, despite the vociferous protestations from both that their internal regulatory systems are packed-packed-packed with civilians.  Yes … ‘selected’ civilians !

That particular evening in the Davenport Hotel, Dublin … the RIAI’s Extraordinary General Meeting (EGM) went nowhere … aided and abetted by Council Members at the head table. It was interesting to note that none of the 10 Institute Members who had called the meeting had a seat at that same table.

As we exit the Profound Economic Crisis following the Extravagant Celtic Tiger Years … and coldly look around us … we witness an architectural profession lost in a contextual wilderness – urban, environmental and social – while fumbling around in a legal and political maze.  And, every day, we experience a sprawling, ugly, depressing and unsustainable built environment which is engaged in a sad and brutal conflict with nature.

It has taken at least a generation … but the RIAI has directly overseen the slow and progressive dilution of what it means to be an Architect in Ireland.

Time for The Revolution … To The Barricades !!

.

.

END

Defective Building Materials, Irish Pyrite & Chinese Plasterboard – FUBAR !

2014-07-08:  Why do individuals and institutions wake up to a problem only when extensive damage to property, or horrendous injury to people, has already occurred … and the shit hits the fan … big time ?!?   What way is that to organize a society … or protect its communities ???

The Answer is Simple:  Prevention !  Not Cure … when damage cannot be effectively repaired … some injuries can never be healed … and it becomes very costly to do anything !!

.

In Ireland … Part D of the Second Schedule to the Building Regulations, as amended, states the following …

Materials & Workmanship

Legal Requirement D1:  All works to which these Regulations apply shall be carried out with proper materials and in a workmanlike (i.e. competent) manner.

Definition of ‘Proper Materials’

Proper Materials:  Building/construction materials (or products, systems, assemblies, etc.) which are fit for the use for which they are intended and for the conditions/location in which they are to be used.

Reference European Union (EU) Legislation

EU Regulation No.305/2011 of the European Parliament and of the Council, of 9 March 2011, laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC.

[ N.B. The 1989 European Directive on Construction Products (89/106/EEC) was repealed, in 2011, by Article 65 of EU Regulation No.305/2011. ]

.

THEREFORE …

It is the duty of a Supplier … any Supplier, e.g. manufacturer, distributor, agent, wholesaler, whatever … of building/construction materials to clearly show that they are ‘proper materials’, i.e. they are fit for the use for which they are intended and for the conditions/location in which they are to be used.

Refer to SDI’s Technical Guidance Noteswww.sustainable-design.ie/arch/tgn.htm

AND …

It is the duty of the Design Professional in Responsible Charge of a construction project (whoever he/she may be – architect, engineer, etc., etc.) to demand of a Supplier … additionally and most particularly, where there are any doubts about any relevant aspect of that material’s performance … that he/she/they clearly show that the building/construction materials they are supplying are ‘proper materials’, i.e. they are fit for the use for which they are intended and for the conditions/location in which they are to be used.

SO …

When Pyrite, for example, shows up in the hardcore under a finished concrete floor, or in the blockwork of a completed wall, in an Irish building … we know who has ignored his or her legal/professional duty concerning proper and satisfactory compliance with Legal Requirement D1 … and who is liable.

For bureaucrats and the legal profession, this is the end of the story.

BUT …

At this stage – when building occupants are hurt and extremely annoyed following, perhaps years, of inconvenience and discomfort – it’s too late !   The damage cannot be effectively repaired … and such limited repairs which can, in practical terms, be carried out will be very expensive.

PLAY IT AGAIN, SAM …

In Ireland, have we properly learned any lessons from Priory Hall, Pyrite, or Chinese Plasterboard ?   No !

Could these or similar problems occur AGAIN on an Irish building site ?   Yes !

Because … aided and abetted by the professional institutes … a ‘blind eye’ is being turned to the greatest lesson of all … that self-regulation/self-certification does NOT work !!

.

And Other E.U. Member States ???

The wording in national/local legislation may be slightly different … the language certainly will be different … but the legal intent is the same.

Legal/professional duties are similar.

Self-regulation/self-certification doesn’t work there either !

.

.

END